3 bed bungalow, installation of wastewater treatment plant and percolation area storm water disposal, new vehicular access and walling, well, landscaping and ancillary site work. Also the temporary Retention of an existing 2 bed log cabin, temporary septic tank, well, outhouse and temporary vehicle driveway.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
McDonagh's Lane, Glenaraneen, Brittas, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
33% of nearby decided applications were refused. The preview found 421 nearby planning records within 5 km where a location match is available.
- Matched source
- SD18A/0016
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Erection of a 3 bed bungalow, installation of wastewater treatment plant and percolation area, storm water disposal, new vehicular access and walling, well, landscaping and ancillary site work. Also the temporary retention of an existing 2 bed log cabin, temporary septic tank, well, pump house and temporary vehicle driveway.
Construction of single storey dwelling with waste water treatment system, well, 3 ploytunnels in relation to proposed on-site strawberry farm enterprise and all site works.
Erection of three bed bungalow; strawberry farming; contain of 1 stable area for horse; food store and forge installation of wastewater treatment plant and percolation area stormwater disposal; new vehicular access and walling; existing well & pumphouse; landscaping and ancillary site works; temporary Retention of an existing 2 bed log cabin; temporary septic tank and temporary vehicle driveway.
Erection of 3 bed house; Christmas Tree Farming; 1 stable area for horse, food store and forge; installation of wastewater treatment plant and percolation area; storm water disposal; new vehicular access and walling, well, landscaping and ancillary site work; temporary Retention of an existing 2 bed log cabin; temporary septic tank and well; pumphouse and temporary vehicle driveway.
Erection of 3 bed bungalow, installation of wastewater treatment plant and percolation area; storm water disposal; vehicular access and walling; well; landscaping and ancillary site work; agriculture storage for hobby farming; containing 1 stable; area for goats & food store and forge; temporary Retention of an existing 2 bed log cabin; temporary septic tank; well; pump house and temporary vehicle driveway.
The full report covers all 421 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD18A/0016The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report