A 347sq.m extension being single storey to the rear and 2 storey to the side containing light industrial storage and fabrication space.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 15, Crag Crescent, Clondalkin Industrial Estate, Clondalkin, Dublin 22
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 4,413 nearby planning records within 5 km where a location match is available.
- Matched source
- SD18A/0024
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Gabor Construction Limited are applying for Permission for partial change of use as constructed under Reg. Ref. S99A/0146, from Warehouse to Office use (29sqm) to include for internal alterations and extension of current office floor areas on ground and first floor level.
We, Alucraft Ltd, make application to South Dublin County Council for permission. FOR RETENTION of development at this site address: Unit AF4O, Cloverhill Industrial Estate, Clondalkin, Dublin, D22 HY51, for alterations to permitted development under Reg. Ret: 91A/1082, 90A/734, 89A/50, 85A/505, T.A.562., R.A. 1123 and R.A. 1098, comprising of the following: 1. 1 No. 3-sided bike shelter with polycarbonate roof and wall sheets measuring 16.5 sq.m GFA to front of building, 2. 1 No. 3.83M High prefabricated structure comprising of additional office space measuring 76.8 sq.m GEA to front of building, 3. 1 No. 7.61M High, permanent storage enclosure with loading bay measuring 178.42 sq.m GEA to rear of building, 4. 1 No. 2.74M high prefabricated structure comprising of additional WC provision measuring 18.11 sq.m GFA to rear of building connected to existing foul sewer, 5. 1 No. 2.74M high prefabricated structure comprising of additional WC provision measuring 13.47 sq.m GFA to rear of building connected to existing foul sewer, 6. 1 No. 6.54M high permanent loading platform enclosure, measuring 100.95 sq.m GEA to rear of building, 7. 1 No. 3.31M (H) glazed curtain wall entrance porch/lobby to main reception measuring 9.11 sq.m GFA to front of building, 8. 1 No. 2.87M (H) glazed curtain wall entrance porch/lobby to main reception measuring 6.63 sq.m GFAto front of building, and all associated ancillary site works on an overall site area of 2.23 hectares.
Replace existing 18 metre telecommunications support structure (monopole design) previously granted under planning Ref. SD18A/0418 with a new 24 metre high structure (lattice structure design) carrying telecommunications equipment and ground level equipment cabin and fencing.
Retention of an existing 18 metre high telecommunications support structure carrying concealed antennas and link dishes together with ground based equipment and security fencing.
(1) Demolition of front single storey entrance building and rear storage area; removal of trees to facilitate vehicular entrance, road and associated site preparation work; (2) 630sq.m. two storey front entrance building including café and office space with flat roof and building signage; 206sq.m. single storey dispatch fridge with flat roof, level loading dock and canopy complete with associated plant; (3) roller shutter door and canopy and pedestrian doors to existing building; (4) enclosed bin store; (5) reorganisation of parking to provide 49 total parking spaces; (6) enlargement of the existing side plant enclosure; (7) all associated site, civil, drainage and landscaping works required for the construction and usage of the proposed building.
Source match
Matched from public planning record SD18A/0024The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report