Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 7,258 decisions within 5 km, 4 exact-site or onsite candidate records, and 2129 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2129 structured nearby appeal records.
2,129 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Change of use from commercial unit (vacant) to Trampoline Sports Centre. Internal works to provide sports areas, reception area, ancillary cafe, seating areas, visitor bathrooms, storage, office and staff areas (3820sq.m); new fire safety escape doors and external illuminated signage; 70 car spaces & 86 bicycle spaces and all associated works.
Change of use from cold storage to light industrial use.
Retention of first floor mezzanine with a staircase within the interior of the existing warehouse, the exterior is retained. The new mezzanine floor is to be used as additional workspace.
Permission for Retention for an Existing Single Storey Temporary Warehouse Structure, Located to the Rear of the Existing Warehouse Building, together with all associated site works and connection into existing services
The development will consist of the construction of a roofed extension (approx. 450 sqm), to incorporate forklift movements to the packaging area of the existing factory and associated site works to include access doors to existing buildings and demolition of existing storage sheds.
Change of use from light industrial/warehouse to recreation facility (climbing gym), internal reconfiguration to provide coffee dock, toilets & staff facilities and minor elevational changes (front and sides).
The brief summarizes the pattern across all 7,258 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD18A/0104The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief