PlanIntelPlanning precedent preview

Planning precedent report

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 2,505 nearby planning records within 5 km where a location match is available.

Matched source
SD18A/0169
Project type
One-off house
Coverage
5 km radius
2,505Nearby applications
12%Refused
2,211Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

SD18A/0169

New single storey electrical building at a height of 4.15m with an area of 136sq.m., an external utility yard for 2 low voltage containerised generators, 2 step up transformers and an above ground, double-skinned, bunded, bulk storage fuel tank for the purpose of standby power generation. Modifications to existing berm and the addition of a new grassed berm are also to be included all on a 10.3 hectare site. This application relates to development on a site which carries out an activity that requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.

Granted0.0 km09 July 2018
SD20A/0147

Construction of P3 Phase II expansion of the existing P3 biopharma production facility which includes the construction of a circa 2,155sq.m, two storey biopharma production facility to a maximum height of circa 14.9m to be located to the south of the existing P3 building; single storey administration extension of circa 210sq.m to a maximum height of 4m to the north of the existing P3 building and internal modifications to the existing P3 building in addition to all associated site works including delivery area; courier pick up/drop off area with 5 parking spaces (including 1 accessible parking space and 1 E-car space); extension to existing external utilities yard (circa 485sq.m) for 3 heat pumps and other ancillary equipment; new internal site circulation road and re-alignment of existing circulation road; 48 additional car parking spaces (including 3 accessible parking spaces and 5 E-car spaces); 24 covered bicycle stands, hard and soft landscaping and external lighting; there will be temporary site entrance and associated temporary access road located to the south east of the site during the construction phase all on 3.68 Hectare application site located within the Takeda Ireland facility at Grange Castle Business Park; an EIAR (Environmental Impact Assessment Report) is submitted with the application and relates to development comprising of an activity which requires and Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.

Granted0.0 km08 October 2020
SD18A/0092

Amendments to the previously approved application SD17A/0354: Increase of total main building floor area over both floors of 163sq.m, minor amendments to building elevation including changes to external doors and windows to both electrical building and main building, the relocation of the approved electrical building and reduction in area, the relocation of the approved nitrogen tank and the inclusion of a CO2 tank compound of approximately 28sq.m, removal of approved pump house from site plan, removal of piperack connection to existing piperack, relocation of bicycle shelter, relocation and reduction of car parking spaces from 81 to 47 (of these 2 are accessible and 4 are E-Car spaces). An EIAR (Environmental Impact Assessment Report) will be submitted with this application, all on an 8.2 hectare site at Grange Castle Business Park. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.

Granted0.1 km16 May 2018
SD25A/0097W

The installation of solar carports and a ground mounted solar PV array. The proposed development will consist of solar carports (three and five panel versions) over existing surface car park areas, solar panels on ground mounted frames, 1 no. single-storey low voltage / medium voltage transformer (skid) unit, micro inverters, underground electrical ducting and cabling within the development site, integrated lighting for carport areas, and all associated ancillary development works, including ground works and landscaping. Construction and operational access will be via existing site entrances from the existing Grange Castle Business Park internal road network.

Granted0.1 km11 August 2025
SD22A/0303

Construction of a Volatile Organic Compound (VOC) Abatement system comprising of a thermal oxidiser (TO), associated plant equipment and scrubbers positioned on a bunded concrete plinth with a maximum single stack height of 12m along with two access platforms at 2.5 high and 5.0m high used for maintenance only; The system is set within a 489sq.m (including a bunded area of 213sq.m) concrete compound enclosed by a 2.4m high paladin weldmesh black fence to match the existing utilities perimeter fence; 135sq.m single storey utilities workshop will sit adjacent to the Volatile Organic Compound (VOC) abatement system compound with associated hardstanding area and soakpit; 55m (L) x 3.2m (W) x 5.6m (H) pipe rack extension with the addition of a second tier extension 118.6m (L) X 3.2M (W) 1.2m (H) to the existing pipe rack is required to service the new VOC abatement system compound; a contractor's compound 3,420sq.m comprising single stacked portacabins, workshops, parking for 30 contractors, materials delivery and set down area; the compound will be enclosed by a 2.4m tall paladin weldmesh black fence; modifications to the existing internal access road will include the addition of a new access road and footpath around the VOC abatement system compound and utilities workshop; a permanent pedestrian crossing including associated signage at the existing access road giving access between the contractor's compound and the voe abatement system compound; modifications to the existing site lighting, signage, surface water, foul and process wastewater drainage, hard and soft landscaping including a 3m high planted berm to the north of the contractor's compound; An EIAR (Environmental Impact Assessment Report) will be submitted with the application; this application relates to development which comprises an activity requiring an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1922 as amended.

Granted0.2 km07 September 2022
SD21A/0127

Retention of 1 standby diesel generator with an associated flue (15m high) within the permitted generator compound located to the east of the data centre granted under SDCC Reg. SD16A/0345 increasing the number of standby diesel generators from 5 to 6 within the permitted compound.

Granted0.2 km16 July 2021

The full report covers all 2,505 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required