Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 2,251 decisions within 5 km, 4 exact-site or onsite candidate records, and 1047 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1047 structured nearby appeal records.
1,047 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
11 new car parking spaces to the front of the existing building with an enlargement to the surface water attenuation tank previously granted under Reg. Ref. SD17A/0112 together with associated site works.
(A) Change of use from laboratories to office accommodation; (B) provision of 803.2sq.m additional office accommodation at first floor with new fenestration on north east and south west facades and the addition of 5 car parking spaces; (C) alterations to internal layouts and additional connections to underground drainage; (D) retention of existing signage on facade and entrance to site.
Retention of 1 Totem Sign Unit, complete with all associated site works.
1 x 50 KWp solar photovoltaic (PV) will consist of 154 PV panels on the warehouse roof and will occupy an area of 254sq.m.
The development will consist of: The change of use of the existing warehouse to a clean manufacturing area - light industrial. Alterations to the existing south elevation, including the installation of new signage displaying the company name and the removal of the existing balcony. The provision of new double access doors and a new external pathway to facilitate access to the building; including all associated site and ancillary works.
Retention consists of the construction of a rooflight in the main roof to the front of the property.
The brief summarizes the pattern across all 2,251 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD18A/0244The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief