Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 6,563 decisions within 5 km, 8 exact-site or onsite candidate records, and 2282 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2282 structured nearby appeal records.
2,282 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Three storey split level extension to side of existing sports hall to consist of changing and toilet facilities at lower ground floor, performance space at upper ground floor and multi-function space at first floor. Works will also include all associated demolition, landscaping, drainage and site works.
Installation of roof mounted solar photovoltaic (P.V.) system on the roof of the sports hall; cluster of solar pv panels (approximately 85sq.m) lying flat on the roof of the sports hall (approximately 700sq.m).
A cluster of solar PV panels measuring approximately 65sq.m lying flat on the roof of the technology rooms measuring approximately 350sq.m.
The Construction of an 35sqm attic conversion consisting of study/playroom area with storage and rear dormer windows
Change of use of part of existing office at unit 1 first floor to provide additional floor area to existing pre-school facility at unit 2 first floor; associated works including new openable windows at each gable.
Demolition of the 4 existing shed structures on site within the curtilage of the protected structure; Retention and conversion of Scholarstown House (Protected Structure) into two residential units comprised of 1 two bed and 1 three bed units served by private open space in the form of ground floor terrace; The proposed works to Scholarstown House include but are not limited to internal re-configuration; Re-location of the staircase to its original location within the house; Removal of non-original features including the closing up of non-original openings; Creation of a new door opening within the existing alcove, and the blocking up of a window opening both located on the northern elevation; Construction of an apartment block ranging in height from 3 to 5 storeys containing 74 apartment units comprised of 32 one bed apartments, 33 two bed apartments, and 9 three bed apartments all served by private open space in the form of balconies and/or ground floor terraces; The proposed development also includes 100sq.m of residential amenities and facilities consisting of but not limited to a reception, communal amenity room and parcel room; The development will be served by a total of 40 car parking spaces and 183 cycle parking spaces accessed via a new pedestrian and vehicular access off Orlagh Grove with the existing entrances on Scholarstown Road and Orlagh Grove being re-configured to provide for pedestrian and cycle access; All ancillary development works required to facilitate the development including but not limited to, plant rooms, a substation, bin stores, landscaping, boundary treatments and lighting; The proposed development comprises the carrying out of works to a protected structure: Scholarstown House (RPS Ref: 322).
The brief summarizes the pattern across all 6,563 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD18A/0297The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief