Applications tied to the site
Partial coverage13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
13 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 9,242 decisions within 5 km, 13 exact-site or onsite candidate records, and 2835 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
13 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2835 structured nearby appeal records.
2,835 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Demolition of single storey house and construction of two storey house with entrance onto Ballyboden Road and ancillaries.
Stand-alone, portable drop in structure which can house new kitchen with adequate space for 3 staff members in the upper car park, this unit is 6m x 4m in size and can be moved if necessary.
Block 1: consists of previously approved planning permission for crèche under Reg. Ref. S94A/0513 granted in 1995, proposed works include the demolition of the existing single storey extension with the proposed construction of new single storey extension together with the provision of a disabled wc within the existing footprint; Block 2: Retention permission is sought for crèche use in single storey building, area circa 120sq.m; Block 3: Retention permission is sought for crèche use in single storey building, area 27sq.m; Block 4: Retention permission is sought for crèche use in the 2 storey detached building, area circa 247sq.m. Planning is also sought for new single storey single rear extension and minor internal amendments and to enlarge the existing play area and for the provision of a new disabled wc and children's toilets accessed from the play area. Retention permission for 21 car parking spaces. Planning is sought to widen the existing entrance off Ballyboden Road. All with associated site works and drainage.
Retention of the structure and crèche use of Block 3 of existing single storey building, area circa 27sq.m.
Amend the occupancy numbers of the previously granted planning application Reg. Ref. SD17A/0361 which stated a maximum of 134 children to be accommodated on the premises; as per the approved layouts on the planning applications Reg. Ref. S94A/0513, SD17A/0361 and SD18A/0354, the subject application seeks to amend the maximum occupancy numbers to 155 children.
First floor extension and conversion of garage to side.
The brief summarizes the pattern across all 9,242 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD18A/0330The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief