Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 3,757 decisions within 5 km, 10 exact-site or onsite candidate records, and 1335 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1335 structured nearby appeal records.
1,335 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Modifications to existing grant of permission, Reg. Ref. SD17A/0035, consisting of: material change of roof finish for the construction of two new 3 storey primary school buildings for Gaelscoil na Camóige agus Gaelscoil Chluain Dolcáin and a material change of roof finish for the construction of the new single storey PE hall building for Coláiste Chilliain; roof mounted photovoltaic (PV) panels for Gaelscoil na Camóige agus Gaelscoil Chluain Dolcáin and for the PE hall building; Gaelscoil na Camóige will accommodate PV panels on the east facing (rear roof); Gaelscoil Chluain Dolcáin will accommodate PV panels on the south facing (rear roof); the PE hall building will accommodate PV panels on the southwest facing (rear roof); the overall number of PV panels is 340 with an approximate area of 560sq.m.
Construction of a new three-storey extension and alterations to Gaelscoil na Camóige agus Gaelscoil Chluain Dolcáin, previously granted planning permission (Ref: SD22A/0352) and currently under construction. The development will consist of providing 2no. Classroom suites of Special Educational Needs accommodation for each school. Both Special Educational Needs units will be inclusive of 2 no. class base rooms, en-suite toilets, withdrawal room associated with each class base, central activity spaces, staff toilets, pupil toilets and shower facilities, storage and office, all at ground floor level, along with the relocation of 2 no. classrooms and en-suite toilets from the ground floor of both schools ground to first and second floor of the proposed three-storey extension The development will also consist of an extension at first floor level, along with minor alterations to Stair Core 4 to the north elevation of Gaelscoil na Camoige and an extension at second floor level along with minor alterations to Stair Core 3 to the west elevation of Gaelscoil Chluain Dolcáin. The development will also consist of the provision of new soft play external areas for both Special Educational Needs units, connections to the existing drainage layout and all ancillary site development works. The total area for the development is 630m2
Construction of two new three storey primary school buildings for Gaelscoil na Camoige agus Gaelscoil Chluain Dolcain providing 16 classrooms each, a shared general purpose area, ancillary teaching and staff accommodation; The development will also consist of the construction of a new single storey PE Hall building for Colaiste Chilliain; The development will also include two new pedestrian access routes, with one located on New Nangor Road and with another located at the junction of New Nangor Road and Old Nangor Road; A new vehicle entrance and exit onto Old Nangor Road to provide a one-way vehicle route with a bus/vehicle set down zone, conversion of existing vehicle entrance to Colaiste Chillian to an in-only entrance; 2 new hard play courts and play space at each primary school with site landscaping, bicycle parking spaces and car parking spaces for each primary school including accessible car parking spaces, internal refurbishment works to Colaiste Chilliain to facilitate the reintegration of teaching accommodation upon Gaelscoil Chluain Dolcain's move to the new school; Removal of the existing temporary changing room and relocation of car park at Gaelscoil Chluain to provide accessible parking spaces and associated works; Connections to public utility and drainage services, boundary treatments, installation of PV panels, alterations to existing drainage layout and associated site development works.
Demolish existing dilapidated dwelling and construct 2 new semi-detached 2 storey (+ attic room) dwellings and associated works.
Roof Profile revised from a double hipped roof to a Dutch gable style to the side and a dormer window to the rear.
Single storey front porch and ancillary site works.
The brief summarizes the pattern across all 3,757 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD18A/0447The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief