Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 1,380 decisions within 5 km, 2 exact-site or onsite candidate records, and 619 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
619 structured nearby appeal records.
619 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Construction of a single storey extension to the south east gable of the existing 4 bed single storey detached bungalow consisting of: a sunroom of 20sq.m (for the existing dwelling) and a 2 bed family flat of 70.91sq.m; the construction of a detached single storey growing shed of 35.00sq.m on lands to the rear of the existing dwelling and all development works.
Construction of a single storey extension to the south east gable of the existing 4 bed single storey detached bungalow consisting of: a sunroom of 20sq.m (for the existing dwelling) and a 2 bed family flat of 70.91sq.m; the construction of a detached single storey growing shed of 35.00sq.m on lands to the rear of the existing dwelling and all development works.
Proposed domestic extension to rear, internal alterations, New wastewater treatment system with percolation area and all associated site works
Construction of dormer bungalow, foul waste water treatment system and all associated site works and landscaping.
Amendments to existing dwelling house: (a) Removal of existing pitched roof and replacement with new flat roof, (b) Demolition of existing bay window to the front and construction of a new single storey extension, (c) Redesign of existing sun room to side to include new roof and extension to the rear, (d) New first floor extension partially located over existing dwelling footprint, (e) New two storey extension to rear, (f) Revised external window and door arrangements throughout, (g) Decommissioning existing sewage treatment system and replacement with a new on-site wastewater treatment system, (h) Connection to all existing on-site services, landscaping and all associated development works.
First floor extension to existing house; new garage to side; change in roof profile to parapet style flat roof; new sewage treatment system with percolation area.
The brief summarizes the pattern across all 1,380 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD18B/0165The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief