Single story extension to the front of the building with a concrete tiled roof and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
45, The Woods, Millbrook Lawns, Tallaght, Dublin 24.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 4,575 nearby planning records within 5 km where a location match is available.
- Matched source
- SD18B/0293
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Ground floor partial front extension; ground floor side extension with 3 rooflights over; ground floor rear extension with 1 rooflight over; all with pitched roofs over; dormer roof window on rear slope of roof at attic level.
Single storey side garage for demolition. Construction of 2 storey side extension with ground floor front extension and rear first floor extension with pitched roofs over and with 2 roof lights over in rear slope of roof.
Construction of slate clad pitched roof structure not exceeding 8.950m in height above ground level to cover flat roof; dormer roof over stairwell with frosted window to attic landing level on south facing elevation; roof light over and 'Velux' windows to front and rear storage space on east facing elevation; all associated site works.
Retention of conversion from garage to utility room and removal of front wall.
Widening of existing vehicular access
The full report covers all 4,575 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD18B/0293The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report