Applications tied to the site
Partial coverage20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 1,343 decisions within 5 km, 20 exact-site or onsite candidate records, and 629 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
20 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
20 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
629 structured nearby appeal records.
629 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Domestic extension to side of house.
Construction of (i) a new flat roofed two storey dwelling, (ii) a new single storey domestic garage, (iii) a new front boundary wall and side boundary fences; alterations to existing site entrance to form new dual site entrance, alterations and new connection to existing foul sewer and all associated site works.
(a) Demolition of existing cottage; (b) construction of a new terraced building consisting of 3 storey and a half type dwelling units and 1 bungalow dwelling unit; (c) on-site hard surfaced car park containing 8 spaces; (d) permission to block up existing single vehicle entrance and construct a new two vehicle site entrance to the north west; (e) construction of new foot path from proposed new entrance, along frontage of subject site and adjacent site to connect to existing foot path from Saggart Village to the south east; (f) upgrade of existing connection to main foul sewer to allow for multiple proposed dwellings; (g) landscaping and all associated site development works.
Installation of P.V. (photo voltaic) solar panels at roof level to be fixed onto the rear/south elevation. There will be 20 1.65m wide x 0.91m high x 34mm tk panels laid horizontally, giving a total surface area of 30.05sq.m. & producing a total array peak power output of 5.40kWp.
The construction of a new one-bedroom single storey timber frame dwelling to the Northwest of the rear garden. ii). Alterations to existing site entrance to facilitate visibility lines. iii). Connection to existing foul sewer. iv). All associated site works and landscaping.
Alterations to floor plans, elevations, site layout and all associated site works of previously approved dwelling (Reg. Ref: SD09A/0081).
The brief summarizes the pattern across all 1,343 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD18B/0473The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief