Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
Newlands Cross, Clondalkin, Dublin 22Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Newlands Cross, Clondalkin, Dublin 22

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The site check found 4,135 decisions within 5 km, 50 exact-site or onsite candidate records, and 1431 structured appeals.

Matched source
SD19A/0067
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

50 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

50 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.

3 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

1431 structured nearby appeal records.

1,431 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.

1 matched
4,135Nearby applications
50Site-linked candidates
11%Nearby refused
1,431Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

SD19A/0067

Alterations to side (east) elevation of bank to comprise of the removal of window and part wall below; installation of external door and make to remaining opening to match existing; all associated site works.

Granted0.0 km18 April 2019
SD20A/0068

Alterations to existing boundary wall/railings; proposals to construct a new pedestrian entrance gate and new concrete path to existing bank with all associated site works.

Granted0.0 km30 June 2020
SD24A/0102

The development will consist of the material alteration to existing medical centre (150msq) with the proposed expansion of the medical centre to provide additional floor Area (25msq) provided by the proposed reduction of the adjacent existing retail shop area reduced from 96msq to 71msq, new window to the east elevation in accordance with lodged plans and documents to include all associated/ancillary works

Granted0.0 km21 June 2024
SD22A/0062

(1) The demolition of the existing shed/garage building to the rear of the existing dwelling; (2) the construction of 2 2-bedroom, 3 person detached two storey pitched roof mews dwellings with a single storey flat roof rear projection, located to the rear of the existing dwelling and fronting onto Brideswell Lane (3) the vehicular entrance is off Brideswell Lane (4) connection to all public services, and (5) all necessary ancillary site development works to facilitate this development.

Refused0.0 km19 April 2022
SD23A/0212

Construction of a new 2 storey 3 bedroom detached pitched roof dwelling with a single storey flat roof rear projection within the side garden off the existing house. The vehicular entrance off Boot Road is as existing. Connection to all public services. All necessary ancillary site development works to facilitate this development

Refused0.0 km24 January 2024
SD19A/0131

Demolition of shed buildings; construction of a 2 storey, 2 bedroom detached dwelling with attic conversion with dormer window within rear roof slope within the side garden of the existing house; vehicular entrance off Boot Road is as existing; connection to all public services; all necessary ancillary site development works.

Granted0.0 km11 June 2019

The brief summarizes the pattern across all 4,135 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required