Applications tied to the site
Partial coverage15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 5,409 decisions within 5 km, 15 exact-site or onsite candidate records, and 1642 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1642 structured nearby appeal records.
1,642 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
New mezzanine floor comprising 954sq.m as part of the racking installation and 47sq.m over ancillary offices for warehousing.
Change of use of the existing building on site (comprising 763sq.m gross floor area) from office use to light industrial use (comprising the assembly of hampers and online orders at first floor area, digital device repair and refurbishment at second floor level with ancillary staff canteen and reception area at ground floor level); The development also includes the provision of a bicycle store (6 spaces) at ground I undercroft level, along with all ancillary works.
(1) Construction of rear extension to existing warehouse (total extension area 500sq.m); (2) relocation of existing rear entrance along southern boundary and all associated works.
Internal reconfiguration and first floor internal extension (98.36sqm) to the existing light industrial unit (total gross floor area of building increases from 1003.9sqm to 1102.26sqm) and change of use to accommodate warehousing / distribution, professional trade support and training services, showroom for display and sale of painting products, ancillary offices and all associated staff accommodation. Permission is sought for revisions to the existing parking and servicing / delivery areas within the site via existing vehicular entrances from Elm Road and Chestnut Road, minor changes to the southern elevation, new building mounted signage and all associated site and development works associated with the above.
Construction of vehicular access onto Holly Road.
Re-cladding with a flat profile insulated steel wall panel to the three perimeter walls and reconfigured glazing elements to match the internal reconfiguration of the ground and first floor office layout with the provision of both a new lobby entrance (3sq.m) and a new wall mounted logo signage facing Willow Road.
The brief summarizes the pattern across all 5,409 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD19A/0230The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief