Retention of first floor mezzanine with a staircase within the interior of the existing warehouse, the exterior is retained. The new mezzanine floor is to be used as additional workspace.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 4, Ballymount Business Park, Ballymount Drive, Robinhood, Dublin 12
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 7,142 nearby planning records within 5 km where a location match is available.
- Matched source
- SD19A/0271
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Full planning permission for a standalone single storey storage unit to the side and rear of existing building and all associated site works.
Change of use from cold storage to light industrial use.
Change of use from commercial unit (vacant) to Trampoline Sports Centre. Internal works to provide sports areas, reception area, ancillary cafe, seating areas, visitor bathrooms, storage, office and staff areas (3820sq.m); new fire safety escape doors and external illuminated signage; 70 car spaces & 86 bicycle spaces and all associated works.
Permission for Retention for an Existing Single Storey Temporary Warehouse Structure, Located to the Rear of the Existing Warehouse Building, together with all associated site works and connection into existing services
Erection of 2 two storey industrial units adjacent to existing S1 unit comprising of warehouse, office and toilet at ground floor level and proposed storage to mezzanine floor level; alterations to external area/existing car park and all associated site works.
Source match
Matched from public planning record SD19A/0271The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report