Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
The Grange, Ballymakaily, Newcastle Road, Lucan, Co. Dublin.Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

The Grange, Ballymakaily, Newcastle Road, Lucan, Co. Dublin.

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The site check found 2,623 decisions within 5 km, 9 exact-site or onsite candidate records, and 881 structured appeals.

Matched source
SD19A/0322
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

9 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.

3 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

881 structured nearby appeal records.

881 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.

1 matched
2,623Nearby applications
9Site-linked candidates
12%Nearby refused
881Structured appeals

Top refusal reasons nearby

Flood Risk2
Rural Housing Need2
Visual Amenity2
Design1
Other1

Nearest planning decisions

SD19A/0322

Construction of 1 & 2 storey office building, c.9.43m in height providing a total GFA of 459sq.m.; provision of 11 total car parking spaces; 8 covered cycle parking spaces; the removal of the existing temporary structures, landscaping, tree planting and all associated site and infrastructural works.

Granted0.0 km05 December 2019
SD18A/0298

Amendment and completion of the permissions granted under Reg. Ref. SD16A/0214, SD16A/0345, SD17A/0141 and SD17A/0392 as well as the construction of two new single storey data halls and associated office areas and plant, with a gross floor area of 5,823sq.m. 1 new single storey data hall (1,857sq.m) plus single storey offices (719sq.m) will be located to the immediate east of the data hall that was permitted and subsequently extended under Reg. Ref. SD17A/0141 and SD17A/0392. The new data hall will include plant at roof level; associated support services, 4 standby generators with associated flues (each 15m high) and service road. 1 new single storey data hall (3,005sq.m) plus delivery bay (242sq.m) will be located to the north of the extended data centre granted under Reg. Ref. SD17A/0141 and SD17A/0392 and to the south of the permitted attenuation pond. The new data hall will include plant at roof level; associated support services, 8 standy generators with associated flues (each 15m high) and service road. Relocation and redesign of the two storey ESB substation (556sq.m) with associated transformer yard and single storey transformer building (180sq.m) permitted under SD16A/0345 to the immediate north of the entrance into the site from Grange Castle Business Park. The development will also include a revised location for the sprinkler tank and pump room permitted under SD17A/0392, as well as a revision and extension to the permitted service road to provide vehicular access to all data halls and relocation of the 3 car parking spaces permitted under SD17A/0392 as well as the creation of 14 new spaces (17 spaces overall) and sheltered bicycle parking to serve this element of the development. The development will also include modifications to the attenuation pond, and to the landscaping previously permitted. The development will continue to include ancillary site works, connections to the existing Grange Castle infrastructural services as well as fencing and signage. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.

Granted0.1 km16 October 2018
SD22A/0009

Retention and completion of amendments to the permitted internal road layout, internal fencing and other ancillary internal layout amendments that were permitted under SDCC Planning Ref. SD18A/0298.

Granted0.1 km22 August 2022
SD22A/0333

Construction of 2 adjoined single storey data centres with associated office and service areas with an overall gross floor area of 15,274sq.m comprising of the construction of 2 adjoined single storey data centres with a gross floor area of 12,859sq.m that will include a single storey goods receiving area / store and single storey office area (2,415sq.m) with PV panels above, located to the east of the data centres as well as associated water tower, sprinkler tank, pump house and other services; The data centres will also include plant at roof level; with 24 standby diesel generators with associated flues (each 25m high) that will be located within a generator yard to the west of the data centres; New internal access road and security gates to serve the proposed development that will provide access to 36 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; New attenuation ponds to the north of the proposed data centres; Green walls are proposed to the south and east that will enclose the water tower and pump house compound; The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage; The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC Planning Ref. SD19A/0042 / ABP Ref. PL06S.305948 and Ref. SD21A/0042; The site will remain enclosed by landscaping to all boundaries; The development will be accessed off the R120 via the permitted access granted under SDCC Planning Ref. SD19A/0042 / ABP Ref. PL06S.305948 and SD21A/0042; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.

Refused0.2 km20 July 2023
SD20A/0031

Relocation of the temporary gas powered generation plant for a further two years from lands to the rear of the Takeda Ireland complex to the east of the site; to lands to the immediate north-west within the Edgeconnex campus and to the immediate east of the data centre granted and built under Reg. Ref. SD17A/0141 and SD17A/0392; the relocated temporary gas powered generation plant will be enclosed within a walled yard of 2,836sq.m containing 12 generator units with associated flues (each 15m high) that was permitted for a period of three years on the 15th May 2017 under condition No. 4 of permission granted under Reg. Ref. SD17A/0027; vehicular access to the generation plant will remain from the permitted service road into the Edgeconnex site and Grange Castle Business Park as originally permitted.

Granted0.2 km09 April 2020
SD19A/0342

Retention and continuance of the use for a further two years of the temporary gas powered generation plant which is located to the rear of the Takeda Ireland complex, is sited within a walled yard of 2,836sq.m containing 12 generator units with associated flues (each 15m high) which was permitted for a period of three years on the 10th January 2017 under Condition no.3 of permission granted under Reg. Ref. SD16A/0345; vehicular access to the generation plant will remain from the permitted service road into the EdgeConneX site and Grange Castle Business Park as originally permitted.

Granted0.2 km19 December 2019

The brief summarizes the pattern across all 2,623 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required