Storage shed & associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
3, Limekiln Close, Walkinstown, Dublin 12.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 9,240 nearby planning records within 5 km where a location match is available.
- Matched source
- SD19B/0269
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Ground floor extension to the rear, an infill extension to the side, additional windows to the side, an attic conversion to habitable status with the provision of a dormer roof to the front, a new roof over the garage wrapping around over the porch, and all ancillary works necessary to facilitate the development.
Demolition of existing chimney breast and single storey annex to side and rear; extension of existing house to side; two storey parapet flat roof extension to rear and side; single storey extension to rear; extension of existing front dormer; alterations to existing bay window to front incorporating a new canopy and front entrance; widening of existing vehicular entrance to 3.5m and associated site works.
Construction of a new two storey dwelling and associated site works.
(1) permission for extension of existing dormer roof to front roof slope and 11m ground floor extension to the rear of dwelling; (2) retention of an 8m dormer roof to rear roof slope.
The development will consist of A) Dormer Extension to front and back, B) Raising of the roof to existing extensions to side and rear, C) New first floor Window to side of existing dwelling and all associated site works
Source match
Matched from public planning record SD19B/0269The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report