Change of use of attic to storage use; dormer to the rear roof; 2 rooflights to the front roof.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
3, St. Anne's, Terenure, Dublin 6W
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 11,860 nearby planning records within 5 km where a location match is available.
- Matched source
- SD19B/0352
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Single and two storey extension to the rear and alterations to existing front garage elevation, all including associated site works to an existing semi-detached two storey dwelling.
Attic conversion for storage; dormer window to the rear; 2 ‘Velux’ windows to the front; single storey extension to the rear.
Existing telecommunications support structure (previously refused under Ref. SD08A/0745 and then subsequently granted under An Bord Pleanála Ref. PL06S.232536) together with antennas, dishes, equipment, cabinets, fencing and all associated site development works; The development will continue to provide high speed wireless broadband and data services.
Permission for a new dormer window to the rear and removing the existing chimney and 2 No rooflights and fit 1 No new rooflight to the front (east) elevation.
Demolition of single storey extension to side and construction of a new 2 and a half storey detached four bedroom house to side with new vehicular entrance and all associated site works
The full report covers all 11,860 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD19B/0352The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report