Applications tied to the site
Partial coverage18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
18 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 7,398 decisions within 5 km, 18 exact-site or onsite candidate records, and 2485 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
18 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2485 structured nearby appeal records.
2,485 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Two storey extension the front comprising of a porch at ground floor with bedroom over a single storey ground floor extension to the rear with increased dormer width above and all associated ancillary site works.
Amendment to granted permission for Reg: Ref SD17B/0130 for the demolition of an existing single storey side extension & the construction of a two storey side extension including a new dormer window & roof light to the front elevation and new dormer window to the rear elevation, as well as widening existing vehicle entrance within the front boundary and all associated works. The proposed amendment includes the addition of a new 3sq.m. dining bay to the rear, revised ground floor rear elevation & interior modifications to the gound floor. No amendments are being made to the front of the property.
A detached 3 bedroom dormer bungalow and associated site works in the side garden.
Demolition of existing side shed, new single storey front and side extension, alteration to front entrance with new porch, two storey extension to the side/ rear of the dwelling, new dormer type window to the rear roof, Velux type window to the front, some internal alterations and associated site works.
Demolition of existing single storey rear extension, and replacement with new construction with additional new area, to the rear of existing dwelling, Velux type of windows to the rear and front of the existing roof, internal alterations, and associated site works.
Modification to existing grant of permission, Ref. SD12A/0094, by increasing enrolment in the morning preschool session (9am until 12 noon) Monday to Friday, from 14 to 16 children; modification to existing grant of permission, Ref. SD19A/0066, consisting of increasing enrolment in the afternoon preschool session (1pm to 4pm) Monday to Friday, from 11 to 16 children.
The brief summarizes the pattern across all 7,398 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD19B/0375The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief