Sud-division of unit previously granted planning permission under planning Ref. SD16A/0065 into two separate units; minor internal alterations to layout of the previous grant.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
33 Robinhood Industrial Estate, Clondalkin, Dublin 22.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 6,723 nearby planning records within 5 km where a location match is available.
- Matched source
- SD20A/0085
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Change of use from light industrial/warehouse to recreation facility (climbing gym), internal reconfiguration to provide coffee dock, toilets & staff facilities and minor elevational changes (front and sides).
Permission for Retention for an Existing Single Storey Temporary Warehouse Structure, Located to the Rear of the Existing Warehouse Building, together with all associated site works and connection into existing services
Retention of an existing 18m high telecommunications support structure carrying antennas and link dishes together with ground based equipment and security fencing at site adjacent to Rose Confectionary Ltd.
Change of use from commercial unit (vacant) to Trampoline Sports Centre. Internal works to provide sports areas, reception area, ancillary cafe, seating areas, visitor bathrooms, storage, office and staff areas (3820sq.m); new fire safety escape doors and external illuminated signage; 70 car spaces & 86 bicycle spaces and all associated works.
Change of use from cold storage to light industrial use.
Source match
Matched from public planning record SD20A/0085The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report