Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Newlands Golf Club, Newlands Cross, Clondalkin, Dublin 22

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The preview found 3,928 nearby planning records within 5 km where a location match is available.

Matched source
SD20A/0098
Project type
One-off house
Coverage
5 km radius
3,928Nearby applications
11%Refused
3,480Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

SD20A/0098

2 single storey shed for the storage of bags and trolleys and for the use as a practice swing room, located in the area adjacent to the maintenance yard and parking and all associated works.

Granted0.0 km09 July 2020
SD20B/0205

Garage conversion and extensions at first floor to side and at ground floor with level access deck to rear.

Granted0.4 km07 January 2021
SD23A/0036

Removal of the three existing grounds keeping sheds and a portacabin unit and replacement of these with a new single building facility in the same location to contain all staff and storage requirements for the groundskeeping and maintenance of the Belgard Castle Estate; The proposed building is 795sq.m in area and consists of areas for storage of machinery ground maintenance equipment, general storerooms and a mechanical and electrical plant room; A part mezzanine floor will provide for additional storage space at first floor; Staff facilities to be provided include for an office area, a canteen, changing/locker rooms with toilets and showers; Externally there will a vehicle and equipment wash area, general hardstanding and staff car parking; Associated civil works include connections to a rainwater storage and connection to a RW soakaway, and a connection to the existing mains for foul water services; The building will be clad in green corrugated sheeting, while burnt timber sheeting will clad the staff area, which will also have a sedum green room. A roof mounted PV array, heat pump technology, rainwater storage and all associated site works also form part of the application; Belgard Castle is a protected structure Ref 206, and a recorded monument - reference SMR DU021-026

Granted0.5 km24 July 2023
SD25A/0092W

The proposed development will consist of: Changes to existing hotel signage with the erection of 6no. signs and all other associated site development works. Sign No.1 (6.1m x 2.1m) is a high level sign to replace the existing sign on the northern elevation. Sign No.2 (4.6m x 2.1m) is a high level sign to replace existing on the southern elevation. Sign No.3 (5.3m x 2.2m) is a high level sign to replace existing on the western elevation. Sign No.4 (3.9m x 0.3m) is a low level sign above the main entrance of hotel to replace existing. Sign No.5 comprises 2no. new circular panel signs (600mm x 600mm each), either side of the main hotel entrance. All signs are to be internally illuminated by means of LEDs, giving face illumination only.

Granted0.5 km11 June 2025
SD25A/0224W

The proposed development will consist of: Changes to existing hotel signage with the erection of 6no. signs and all other associated site development works. Sign No.1 (4.5m x 1.5m) is a high level sign to replace the existing sign on the northern elevation. Sign No.2 (4.1m x 1.4m) is a high level sign to replace existing on the southern elevation. Sign No.3 (4.5m x 1.5m) is a high level sign to replace existing on the western elevation. Sign No.4 (3.9m x 0.3m) is a low level sign above the main entrance of hotel to replace existing. Sign No.5 comprises 2no. new circular panel signs (600mm x 600mm each), either side of the main hotel entrance. All signs are to be internally illuminated by means of LEDs, giving face illumination only.

Granted0.5 km11 November 2025
SD23A/0021

The development will consist of the construction of a single storey Deposit Return Scheme (DRS) Unit (Gross Floor Area: 17 sq. m) comprising of 2 no. signage panel areas for branding on the side elevation of the DRS Unit (1.0m x 2.0m), and all associated site development works. The development will result in the removal of 2 no. existing car parking spaces in the car park that serves the existing Aldi development. There is a Protected Structure on this site.

Granted0.5 km29 March 2023

The full report covers all 3,928 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required