Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 6,033 decisions within 5 km, 11 exact-site or onsite candidate records, and 2043 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2043 structured nearby appeal records.
2,043 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Modification to existing entrance gate and installation of ramp; dock leveller and buffer seals to existing vehicular building entrance and all associated ancillary site works.
Subdivision of single light industrial/warehouse unit into three self-contained, light industrial/warehouse units; vehicular entrance on east elevation; all associated ancillary site works.
Demolition of an existing building, 2 new portacabins, a power wash enclosure, fences, gantry and fuel dispensers, revisions to internal site layout to include new vehicular and pedestrian movement arrangements. revised bund walls, relocated stepped access route of tank farm and bottom loading skid, construction of new forecourt fuel area with 2 pump dispensers, new payment building, new single storey office building, new services area with 2 car parking spaces, 12 staff car parking spaces and 8HGV/Tanker parking spaces, all other associated underground and overground infrastructure, drainage, lighting, landscaping, and site development works.
The development consists of the retention of existing 60 sq. m. of additional first floor offices within Unit 13.
Construction of a new 2 storey building (c.8229sq.m) for use as a data storage facility. The new facility will be an annex to, and accessed through, the neighbouring data storage facility to the north via the existing site entrance serving same. The development will include electrical rooms for electronic operations, mechanical plant rooms and support areas including offices and welfare facilities, a loading bay and back-up generators in a fenced compound. Existing boundary structures including railings, fencing and gates will be replaced with a new 3, high perimeter railing. Ventilation plant at roof level will be screened from view on all sides (all at the former Barretts site).
Retention of alterations to previously granted planning permission, Reg. Ref. SD14A/0232: (1) Modification to the site entrance arrangement at the north boundary, including the omission of the security hut and the redesign of gates; (2) redesign of the sprinkler water tank and pump house compound; (3) relocation of the humidifier pump house and tanks to the south eastern corner of the main building, with the redesigned tank room enclosed within the main building; (4) rearrangement of the stand by generators layout; (5) relocation of the temporary substation to the south western corner of the main building; (6) new enclosure to stand-by generators; (7) rearrangement of the accessible parking spaces; (8) 164sq.m of added circulation, loading and storage accommodation at ground floor level and 9sq.m at mezzanine level; (9) changes to the main building to facilitate access to the relocated loading bay; (10) internal layout changes to offices and west storage bay areas with associated elevational changes; (11) 79sq.m of additional accommodation at first floor level with associated elevational changes; and (12) enlargement of louvered wall vents on the south elevation. The total added accommodation equals 252sq.m.
The brief summarizes the pattern across all 6,033 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD20A/0099The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief