Temporary staff car parking of c.0.13ha. to accommodate 35 staff car parking spaces and associated site works while the Phase 1 Griffeen Valley ETNS building is being remediated. This temporary staff car parking will be located on a site measuring 2.32 ha. overall.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Kishogue Cross, Griffeen Avenue, Lucan, Co Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 2,823 nearby planning records within 5 km where a location match is available.
- Matched source
- SD20A/0111
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
A 3 storey, 1,000 pupil post primary school (Roll no. 76454S) including a 4 classroom Special Educational Needs Unit with a gross floor area of 11,443sq.m including sports hall and all ancillary teacher & pupil facilities; bicycle parking; staff parking; vehicle drop off/set down areas; internal access roads; hard and soft play areas; piped infrastructure and ducting; plant; landscaping and boundary treatments; PV panels; external courtyards; disabled car parking spaces; ESB substation, ramps & stairs; signage; changes in level and all associated site development and excavation works above and below ground all on a site bounded to the east by the R136 Outer Ring, to the north by the existing site adjacent to south of Griffeen Avenue, to the west to existing site adjacent to Lucan East Educate Together National School and to the south to existing site adjacent to Adamstown Link Road. The proposed development is located within the Clonburris Strategic Development Zone Planning Scheme 2019 area.
Retention permission consists of the construction of a canopy structure to the west of the main school building.
Retention of construction of canopy structure to the west of the main school building.
The development which is in a strategic development zone will consist of removing section of grass margin extend existing concrete apron, install accessible kerb, relocate existing litter bin, and erect a proposed new stainless steel and glass bus shelter, 5.2 m x 1.85 m x 2.8 m high on public footpath with 2 no. LED illuminated advertising panels each of 2.0 square metre area.
Attic conversion to storage space to include the following: main hipped roof design changed to a gable style roof with a small 'Dutch' hip design, 5 roof lights incorporated on the main roof structure of the rear elevation, new gable wall constructed with matching materials to that of the main house.
Source match
Matched from public planning record SD20A/0111The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report