Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Ballycullen Green, Old Court Road, Dublin 24

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The preview found 3,825 nearby planning records within 5 km where a location match is available.

Matched source
SD20A/0149
Project type
One-off house
Coverage
5 km radius
3,825Nearby applications
11%Refused
3,411Conditional grants
3Refusal reasons

Top refusal reasons nearby

Density1
Procedure Invalid1
Traffic Sightlines1

Nearest similar decisions

SD20A/0149

New LED floodlighting system of 6 columns at 21.3m in height; installation inclusive of all associated ducting, column foundations and bases and all LED lighting fixtures.

Granted0.0 km04 May 2021
SD23B/0474

A 2-storey side and rear extension comprising of a playroom on ground floor, 2 no. bedrooms on first floor, new first floor window to rear & side elevations of existing house, partially raise boundary wall to join into top of existing wall level along roadside elevation and all associated site works.

Granted0.1 km10 January 2024
SD21A/0137

Provision of a temporary two storey post-primary school (Firhouse Educate Together Secondary School: Roll No. 68307J), comprising 10 classrooms and 3 specialist classrooms including all ancillary teacher and pupil facilities (2,000sq.m. gross floor area approximately); provision of an internal vehicular drop-off area and internal circulation routes; 15 surface parking spaces; bicycle parking; ball courts and play areas; access to the proposed temporary school will be from Oldcourt Road; provision of piped infrastructure and ducting; plant; pedestrian access points; ESB substation; attenuation tank; landscaping and boundary treatments; ancillary ramps and stairs; signage; changes in level and all associated site development and excavation works above and below ground; on a 0.86ha site approximately, which forms part of a larger 1.77ha landholding earmarked to accommodate a future permanent post-primary school; temporary permission for a period of 5 years is being sought.

Granted0.2 km20 July 2021
SD23A/0149

New educational campus, to be delivered on a phased basis comprising 1 No. part 3 storey, 1,000 pupil Post Primary School (Firhouse Educate Together Secondary School: Roll No. 68307J) and includes accommodation for children with special educational needs, a multi-purpose hall and all ancillary teacher and pupil facilities with a gross floor area of c. 11,021 sq.m; The development will also include and permanently incorporate elements of the temporary two storey postprimary school development (permitted under An Bord Pleanála Ref: ABP-311141-21; South Dublin County Council Reg. Ref. SD21A/0137), including vehicular access from Oldcourt Road; 3 ball courts; 2 pedestrian and cyclist access points and 1 pedestrian only access point to the northern boundary of the site; car parking; surface water drainage; attenuation tanks; piped infrastructure and ducting; changes in level and all associated site development and excavation works above and below ground; The development will also include minor revisions to the previously permitted car parking area to allow for the provision of additional car parking spaces to serve the Post Primary School; The development will also include 3 additional ball courts and play areas; 1 storage building (c. 48 sq.m); car parking; electric vehicle charging points; bicycle parking; hard and soft landscaping; waste management provision; cycle and pedestrian routes; boundary treatments; ancillary ramps and stairs; signage; attenuation tank; PV panels; boiler and plant; surface water drainage and SuDS measures (including green roofs); 3 flag poles; street and security lighting; piped infrastructural services and connections; changes in level and all associated site development and excavation works above and below ground; The development will also consist of the retention of an ESB substation located to the south of the vehicular entrance at Oldcourt Road.

Granted0.2 km21 March 2024
SD22B/0502

Attic Conversion for storage with dormer window to the front roof area

Granted0.2 km23 January 2023
SD18A/0025

Development as part of a permitted residential development (under Reg. Ref. SD15A/0150), which is currently under construction and is known as Ballycullen Green, which is located south of Oldcourt Road, Oldcourt, Firhouse, Dublin 24. The permission being sought consists of a change of house type and increase in number from 37 permitted houses to 41 proposed houses. The proposed development is comprised of 5 2-storey, 4 bed detached houses, 34 2-storey, 4 bed semi-detached houses and 2 2-storey, 3 bed semi-detached houses, all on a site area of 1.02 hectares. The proposed development also includes for all associated site development works and the effect of the proposed development will be a modification to an extant permission under Reg. Ref. SD15A/0150.

Granted0.2 km25 April 2018

The full report covers all 3,825 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required