Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
Scoil Carmel Junior National School, Firhouse Road, Dublin 24Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Scoil Carmel Junior National School, Firhouse Road, Dublin 24

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

10% of nearby decided applications were refused. The site check found 5,770 decisions within 5 km, 13 exact-site or onsite candidate records, and 2039 structured appeals.

Matched source
SD20A/0294
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

13 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.

3 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

2039 structured nearby appeal records.

2,039 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.

1 matched
5,770Nearby applications
13Site-linked candidates
10%Nearby refused
2,039Structured appeals

Top refusal reasons nearby

Density1
Procedure Invalid1
Traffic Sightlines1

Nearest planning decisions

SD20A/0294

Room extension at the western end of the main school building. The works will involve the demolition and removal of the existing prefabricated Resource Room structure.

Granted0.0 km18 January 2021
SD24B/0095

Alterations and Single Storey Extension for bedrooms and bathrooms to rear and side with matching hipped tiled roof, related to internal alterations and all associated site works

Granted0.1 km06 August 2024
SD24B/0040W

Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.

Granted0.1 km27 March 2024
SD23B/0209

Attic conversion with dormer roof to rear plus changing existing roof profile from hipped to new mini Dutch roof plus removal of chimney stack and 2 Velux rooflights to front roof slope and all associated site works.

Granted0.2 km29 June 2023
SD25B/0523W

The development seeking retention consists of the construction of a garden structure circa 37sqm for home office and gym use with utility area.

Granted0.2 km23 October 2025
SD26B/0104W

The alterations to the existing roof profile to convert it from a hipped roof profile to gable wall with apex roof, removal of the external chimney stack, conversion of the existing attic space into a home office/study with a dormer window to the rear, 2 roof lights to the front elevation roof plane and a new window in the new gable wall at second floor level.

Granted0.2 km05 May 2026

The brief summarizes the pattern across all 5,770 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required