Applications tied to the site
Partial coverage21 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
21 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 5,792 decisions within 5 km, 21 exact-site or onsite candidate records, and 1834 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
21 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
21 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1834 structured nearby appeal records.
1,834 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
First floor pitched roof extension over existing ground floor consisting of 3 bedrooms with a dormer window to front and side roof; 4 roof lights to side roof; extension to porch at ground floor level to front of dwelling.
Construction of new dormer extension to rear of existing dwelling and all associated works
Construction of a dormer attic conversion with raised roof; gable walls (front and rear) and eaves to provide habitable accommodation; new windows at first floor to front and rear gables; repositioning of front door; new chimney and rooflight within northwest facing roof and dormer window structure to southeast side at first floor; works include associated site, drainage, landscaping works and internal alterations.
Conversion and extension of the existing garage structure and construction of a new link to the existing single-storey four-bedroom house, to provide a single-storey one-bedroom family flat with kitchen/ living area and outdoor area; construct an additional pedestrian gate in the existing garden wall, to install photovoltaic solar panels to the roof of the house and to complete some ancillary site, landscaping, and drainage works.
Ground floor partial side/front extension and porch; ground floor internal alterations; partial raising of roof ridge height and build up of walls at front and rear to create attic conversion, with dormer roof windows on both side roofs, and window at attic level in front elevation.
Removal of existing sun room to rear, construction of a new single storey extension to front, part single, part two storey extension to rear, new window and door to existing northwest side elevation, new roof light to existing southeast side elevation, widening of existing vehicular entrance piers to 3.5m and all associated site works.
The brief summarizes the pattern across all 5,792 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD20B/0031The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief