Change of use of an existing single storey detached store (floor space - 154sq.m) to a research and development gas innovation workshop and store.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Gas Networks Ireland, Kingswood Avenue, Citywest Business Park, Naas Road, Dublin 24
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 2,431 nearby planning records within 5 km where a location match is available.
- Matched source
- SD21A/0147
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
1 x 50 KWp solar photovoltaic (PV) system on main office building. There will be a total of 156 PV panels on the main office roof and will occupy an area of 257sq.m.
Replacement of approx. 206m of existing 2.4m high chain-link fencing and installation of approx. 217m of additional fencing with 3m high security fencing, including associated access / emergency gates and all associated site works at an existing above ground Natural Gas installation.
Permission for a proposed Sprinkler Tank & Pump House and Retention Permission for a reduced size ESB substation as part of an overall warehousing development at Kingswood Road, Citywest Business Campus, Co. Dublin. (Existing granted Planning Reg Ref: SD22a/0290 & SD23A/0281 with associated warehousing development works under construction on site). 1. Provision of Sprinkler Tank 10.00m diameter, 9m high, effective capacity = 675m3, to rear (South-west) yard, which will serve the warehouse building's sprinkler system; 2. Provision of Pump House servicing the proposed sprinkler system, 48m2, 2.8m high, adjacent to above referenced sprinkler tank; and 3. Associated site landscape enhancement in the immediate area of the proposed Sprinkler Tank & Pump House. The subject elements for which Retention Permission is sought are as follows: 1. Retention Permission for a reduced size ESB Substation from 37m2 (as granted) to 24m2 as recently constructed.
For Blanket installation of photovoltaic panels (PV) over existing warehouse roof footprint circa 11,400m2 and all associated works. PV panels will not extend above parapet line. Permission is being sought as building is located between Baldonnell and Tallaght University Hospital Solar Safeguarding Zones
The development will consist of alterations to the existing east elevation to include the provision of a new external fire escape stairs to facilitate the internal subdivision of the existing office building, together with all associated site and ancillary works.
The full report covers all 2,431 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD21A/0147The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report