Demolition of existing workshop and (defunct) Activated Carbon Building adjacent the old/northern Treatment Plant Building; construction of a Sulphuric Acid Storage and Dosing Facility Building (single storey up to approximately 8.7 metres in height) adjacent the new/southern Treatment Plant Building; construction of a Lime Storage & Dosing Facility Building (single storey up to approximately 11 metres in height) adjoining the old/northern Treatment Plant Building, associated external storage silos (2) with external staircase (up to approximately 12.3 metres in height) partially enveloped with a perforated metal architectural screen, and ancillary plant and equipment; reconfiguration and repurposing for use as a De-Alkalisation Plant of existing (disused) High-Lift Pump Hall within the old/northern Treatment Plant Building; construction of a new ancillary Workshop Building (single storey up to approximately 4.5 metres in height) to the rear/south of the 'old/northern Treatment Plant Building; temporary and enabling works to facilitate construction and continued / uninterrupted operation of the Treatment Plant site; associated network of underground pipelines/connections, and redirection of existing where necessary, throughout the site; provision of additional car parking (to the rear/south of the old/northern Treatment Plant Building), modification and extension of existing drainage, utility and services infrastructure and connections to serve and facilitate new and reconfigured buildings, and all other associated and ancillary development and works above and below ground level.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Leixlip Water Treatment Plant Site, Cooldrinagh & Backwestonpark lands, Leixlip, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 1,299 nearby planning records within 5 km where a location match is available.
- Matched source
- SD21A/0272
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Erection of a 17.5m SCADA communications pole with associated underground cable ducting enclosed in a 2.4m high fenced compound.
Opening up of the existing facade to facilitate the installation of 2 new windows into the first floor office area of the existing water treatment building.
New pedestrian exit for emergency exit purposes only from site along Cooldrinagh Lane (R148) and for new toilet facilities for existing function room previously approved SD15A/0258 to replace existing temporary toilet accommodation and for Retention for a period of not more than 4 years for tent structure providing covered link between existing function room and moveable dining booths in part of existing car park.
Retention of garage for the sale/hire of cars, 2 portacabins, signage and ancillary site works in conjunction with the operation of Weston Airport.
Two storey extension to side and rear of existing house (a Protected Structure).
The full report covers all 1,299 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD21A/0272The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report