New pitched roof over the converted garage and rear utility room and canopy over the front porch.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
52, Old Bawn Park, Dublin 24
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 4,093 nearby planning records within 5 km where a location match is available.
- Matched source
- SD21B/0043
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The demolition of existing Side extension and the construction of a new two storey, Pitched-roof side extension with a new pitched roof porch. The construction of a new rear dormer and the construction of a 40m2 Rear Extension. Minor internal alterations to the existing dwelling.
Single storey extension comprising of a link corridor, storeroom and two GP consultation rooms to an existing GP surgery, alterations to the existing surgery front elevation, including new entrance door to existing porch, replacing current entrance door with a window. Works include internal layout changes to existing waiting area with proposed new reception and disabled access toilet.
Garage conversion; Removal of the existing chimney stack; Construction of ground floor extension at rear; First floor extension at front and side of dwelling; New hipped canopy structure over porch and window; New roof light; Widen vehicular entrance and all associated site works.
For construction of new first floor extension at front and side of dwelling, new rear dormer attic structure with en-suite and new hipped porch structure and associated works.
Door to front elevation and widened driveway entrance.
Source match
Matched from public planning record SD21B/0043The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report