Applications tied to the site
Partial coverage42 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
42 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 9,016 decisions within 5 km, 42 exact-site or onsite candidate records, and 2581 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
42 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
42 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2581 structured nearby appeal records.
2,581 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Ground floor extension to the rear; an attic conversion to habitable status comprising three bedrooms and a bathroom; provision of two dormer roofs and windows to the front and rear; reconfiguring the ground floor layout with provision of a window to the side passage; infilling the porch area and all ancillary works necessary to facilitate the development.
Lowering of existing floor level; construction of a new front porch including the addition of a fan light dormer window above; attic dormer to front & rear and the construction of a new flat roof single storey extension to rear of the existing dwelling and all associated site works.
Single storey extension and 'French' doors to the rear, front porch infill, internal renovations, dormer roof to the front of the main roof and all ancillary works necessary to facilitate the development.
Construction of a first floor level, two bedroom and en-suite extension in the form of rear sloped roof with dormer projection to rear; new dormer projection to existing front sloped roof bedroom; minor reconfiguration at existing ground level layout and elevations and minor site works.
The development consists of: A) The demolition of the attached garage to the south-east of the dwelling, B) The construction of a single-storey extension in place of the demolished garage, C) The removal of a timber shed, D) The construction of a single storey extension to the north-east of the dwelling, E) The construction of 2 no. dormer windows to the front elevation, and F) Raising the single-storey roof at the south of the dwelling including all associated site works and services.
Construction of a first floor level two bedroom and ensuite extension in the form of rear sloped roof with dormer projection to rear and new dormer projection to existing front sloped roof above existing bungalow dwelling with minor associated site works.
The brief summarizes the pattern across all 9,016 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD21B/0389The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief