Change of use from doctors surgery to residential dwelling; all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
1, Hillcrest Court, Lucan, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 2,478 nearby planning records within 5 km where a location match is available.
- Matched source
- SD21B/0509
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning Permission for 1) Conversion of existing attic non-habitable storage use. 2) Provision of dormer to the rear roof plane. 3) Ground floor front extension to the front and all associated site works.
Construction of 2 single storey prefabricated buildings incorporating 4 temporary classrooms with ensuite toilet facilities and all associated site and drainage works; Installation of a 12 panel photovoltaic array to the roof of existing school building; retention for the existing single storey prefabricated buildings previously granted under SD17A/0276 and SD13A/0056.
Modifications to previously approved and now constructed single storey rear extension Reg Ref; SD01B/0613. Primary changes to include a new 'A' line pitched roof with 4 rooflights included, a large rear sliding door with glazing up to the underside of the new 'A' line roof works also to include some internal modifications on ground floor. New floating canopy roof over front entry porch.
Demolition of porch and construction of a single storey porch and replacement of the window at the front facade together with all associated site works.
Two-storey commercial building providing two new units and ancillary accommodation (1,574sq.m gross floor area); Unit 1 will be used as a shop (1,057sq.m), Unit 2 will be used for professional services or health centre or office or gymnasium ( 517sq.m); the development will also consist of roof plant and PV panels; Lucan advertising signage (50sq.m) and other indicative illuminated signage zones; extended service yard and new access gates; new pedestrian linkage to adjoining Somerton site; reconfigured customer car park and new vehicle charging infrastructure; standalone substation/switch room (30sq.m); hard and soft landscaping, and pedestrian canopy; connection to services; all associated site and development works.
The full report covers all 2,478 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD21B/0509The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report