Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Heiton Steel, Ashfield, Naas Road, Clondalkin, Dublin

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The preview found 5,020 nearby planning records within 5 km where a location match is available.

Matched source
SD22A/0024
Project type
One-off house
Coverage
5 km radius
5,020Nearby applications
11%Refused
4,455Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

SD22A/0024

Replacement of existing asbestos roof covering with a new Kingspan insulated roof panels; replacement of rooflights with new and installation of a roof mounted solar photovoltaic panels to include all ancillary works and services.

Granted0.0 km28 April 2022
SD23A/0114

Installation of a new canopy roof to the south side of the existing Heiton Steel warehouse and all associated site works.

Granted0.0 km11 July 2023
SD18A/0064

The provision of a new left in left out junction on the N7 for the Red Cow Luas Park and Ride (with provision of extension of cycle and pedestrian facilities)' revised 'gateway' access (and provision internal access points to adjoining lands); and the closure of the existing left in left out junction serving the Luas Park and ride on the N7; Construction of new internal access roads and roundabout (with shared cyclist and pedestrian access) M C. 447m in length, to tie into existing roundabout on the L1019 to serve the Luas 'Park and Ride'. Proposed new extended merge lane of c.254m (to relevant standards), including extension to segregation island along southern side of N7 Naas Road; Provision of new relocated bus stop; Revised access arrangement to Gas Networks Ireland installation (to be accessible at all times during construction and operational phases); All associated and ancillary works, including demolition of former SDS warehouse building of C.9,060sq.m site development works, landscaping, lighting and drainage/attenuation works (including attenuation basin and surface water to lands located in adjacent Newlands Cross Cemetery on lands located to the east of Red Cow Luas Park & Ride Depot adjacent to the L1019, to the south of the N7 Naas Road, within the townlands of Bushelloaf, Ballymount Great and Redcow, Newlands Cross, Dublin 22.

Granted0.2 km30 April 2018
SD23A/0238

Retention permission and permission for development at the existing shotblasting facility. The total planning application site area extends to approximately 0.92 Ha. Retention permission is sought for: a 2 bay portal frame structure at the northern end of the facility and a 153 sq.m floor area extension at the southern end of the facility. Permission is sought for: a 716 sq.m floor area extension at the southern end of the facility; roof to enclose the 2 bay portal frame structure (for which retention permission is sought) minor changes to the internal layout including relocation of toilet and provision of ancillary office space; concrete resurfacing of the main yard area; minor elevational changes; and all associated site and development works above and below ground.

Granted0.2 km23 January 2024
SD21A/0229

Retention for 2 bay portal frame, additional floor area to existing industrial unit. Permission for roofing of 2 bay portal frame structure; extension to existing industrial unit; construction of a concrete resurfaced area in main yard; minor internal layout and elevational revisions to existing industrial unit and all associated site works including underground surface water attenuation and related utilities and works.

Refused0.2 km27 July 2022
SD24A/0141W

A self-storage facility (for a temporary period of three years) comprising 40 no. 20 foot long shipping containers (14 sq.m. each)

Refused0.3 km25 July 2024

The full report covers all 5,020 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required