Applications tied to the site
Partial coverage30 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
30 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 1,035 decisions within 5 km, 30 exact-site or onsite candidate records, and 479 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
30 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
30 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
479 structured nearby appeal records.
479 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Demolition of some of the existing structures on site to include a portion of an existing rubble wall; the rear extension of an existing cottage; existing structures, storerooms, and sheds to the west and north of Muldowney's Pub; the reconfiguration, renovation, and extension of the existing cottages on site to provide for 2 two bedroom units; the reconfiguration and renovation of Muldowney's Pub and storage yard; the construction of 21 residential units within 2 three storey blocks to the rear and side of Muldowney's Pub as follows: Block A will provide 6 one bedroom units, giving a total of 6 apartments in this building; Block B will provide for a mix of 3 one bedroom and 12 two bedroom units, giving a total of 15 units within this Block; private open space will be provided in the form of balconies with communal open space provided in the centre of the site. The development will also include the provision of a pedestrian access from Main Street and a pedestrian and vehicular access via the existing car-park entrance to the rear of Muldowney's Pub; Provision of 32 carparking spaces and 44 bicycle spaces, all ancillary hard and soft landscaping, boundary treatment, ESB sub-station, signage, bin and bike stores and all engineering and site development works necessary to facilitate the development.
A) the part demolition of Muldowney's Pub to the rear; b) the change of use of the front portion of the pub to provide for 2no. 1-bed units; c) the construction of 8 no. own-door residential units within a single three storey block to provide 4no. 1- bed units and 4no. 2-bed units; d) enlargement of residential bin storage; reallocation of permitted car parking to the amended development; e) all ancillary hard and soft landscaping, boundary treatment, signage, engineering and site development works necessary to facilitate the development
Amendments to Permitted P.R.R. SD22A/0096 for: a) Demolition of existing stone cottages on which works have commenced; b) reconstruction of cottages in modern materials to match existing structures in form to allow for 2 no. 2-bedroom single storey residential units; c) reuse of the existing roof slates to the front and new roof slates to the rear; d) construction of yard boundary walls within the site using reclaimed stone from the cottages; e) all ancillary landscaping and site development works necessary to facilitate the development.
Removal of all existing temporary accommodation and construction of a new 16 classroom part three storey, part two storey primary school (Roll No 19503H); including GP Hall, 2 classroom Special Educational Needs Unit and all ancillary site works. The proposed project also incorporates associated staff car parking, delivery aces, drop off areas, pedestrian/bicycle access, construction of 2 external ball courts, acoustic boundary wall plus additional boundary treatments, landscaping, connection to public services and all associated site works.
Temporary single storey prefabricated building to be linked to the existing single storey prefabricated building granted under Ref. SD19A/0075; 2 general classrooms each with toilet accommodation (one containing accessible WC); 1 store; entrance lobbies; 1 user assisted toilet; 2 staff toilets and 4 car park spaces all located to the north-rear of the existing school and existing prefabs together with all other ancillary and associated siteworks.
Single storey prefabricated accommodation consisting of 2 classrooms with ancillary toilets; 1 resource room; a canopy to link the unit to the existing prefab; 4 car parking spaces, all located to the rear of the existing prefabricated unit; the works also include the provision of 2 gates within the existing fencing to the west of the site and a new footpath access to the west connecting to the existing footpath to the front of the site together with all associated site works.
The brief summarizes the pattern across all 1,035 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD22A/0096The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief