Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 2,626 decisions within 5 km, 3 exact-site or onsite candidate records, and 1164 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1164 structured nearby appeal records.
1,164 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Extend the existing two storey building on site that provides after-school education to students in the area, where the new building will facilitate second and third level students; a new shared entrance serving both buildings; proposed extension is a two storey building, matching the scale and massing of the existing building; the building has been designed to achieve a Net Zero Whole Life Carbon standard and this in part is achieved by an external brick skin, a cross laminated timber structural system, harnessing of natural light and extensive use of photovoltaic solar panels; the building programme will provide a lecture theatre, a science laboratory, classrooms, a reading room, offices, a central atrium, and a kitchen facility; the flat roof will carry solar photovoltaic solar panels and a biodiversity outdoor classroom, and all associated site works; relocate the muga within the complex to the east of the existing building and provide additional outdoor sports equipment; all proposed boundary fencing will match the existing boundary treatment in size and material.
Two storey two bedroom semi-detached house; Demolition of side rear extension to existing house.
Retention for single storey side and rear extension with pitched roof over for extended living use. Permission to change pitched roof to flat fibreglass roof with parapet with extra ceiling height inside. Front side entrance door to be changed to single window.
Single storey front extension and all associated site works.
Two storey end of terrace house to side of existing house with new vehicular access and all associated site works.
2 storey extension to front, side & rear of existing house, new bedrooms on first floor, playroom lounge on ground floor, new porch across front door extending across to new extension and all associated site works.
The brief summarizes the pattern across all 2,626 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD22A/0124The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief