Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 2,719 decisions within 5 km, 1 exact-site or onsite candidate record, and 1152 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1152 structured nearby appeal records.
1,152 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Construct agricultural shed incorporating loose and storage areas; wall manure area; hardcore area and access roadway; upgrading existing entrance and all associated site works.
Relocation of the existing Clondalkin RFC grounds at Gordon Park to new lands at Kingswood Farm, Moneenalion Commons Lower Clondalkin and comprising of 4 new rugby playing pitches, including a high quality main competition pitch (with modern directional floodlighting comprising 18m high floodlighting columns either side) and a high quality Junior pitch both laid approximately level, and two back pitches as well as various grassed rugby training areas all laid on existing land cross fall levels; change of use of existing agricultural shed to accommodate new two storey changing facility and storage areas; a new two storey Clubhouse Pavilion with supporting facilities including dressing rooms, physio rooms, coffee dock, committee rooms, members bar and lounge, plantroom and toilets; all associated site development sustainability and infrastructure work including connection to existing public foul sewer, SUDs, sedum roof and PV roof panels; new landscaping throughout the site comprising trees, hedges and wild flower areas; new cycle track and pedestrian access and stairs off the R136, bicycle shelter, children's playground area, electrical car charging stations, vehicle parking and new vehicle entrance off the Old Country Roadway.
Relocation of 3 fuel pumps and the reconfiguration of permitted fuel islands from 1 long fuel island and 1 small fuel island to now provide for 3 small fuel islands, demolition/removal of single storey building along southern boundary and 1 new truck wash to south-western boundary of site; Planning permission is sought to remove 1 existing truck wash along the western boundary, demolition/removal of existing storage building to the western boundary and alterations to internal road layout to include directional arrows.
Additional 2no. fuel pumps and 2 no. islands. Retention permission is also sought for works completed. The completed works consist of the installation of 4 number underground fuel tanks (each fuel tank has a capacity of 75,000 litres and store HVO and BIO fuels), including a network of pipes and inspection manholes. These new tanks are located below ground in the Southeast corner of the site.
Construction of single extension (9.8m x 25.4m) to southern gable of Maintenance Centre with an overall height of 7.85m together with all associated site works at Kingswood Commercials Vehicle Test Centre.
Variations to previously approved planning permission Reg. Ref. SD17A/0285 to include the following: (a) removal of existing steps and ramps to the front of the existing hotel reception; (b) construction of a new single storey glazed extension to the existing hotel reception (approx. 250sq.m) to provide a new entrance lobby with feature canopy, coffee dock area, meeting room, enlarged foyer area and link access to existing Cookhouse Bar & Restaurant; (c) construction of a new single storey, glazed conservatory extension to the existing breakfast room (approx. 72sq.m); (d) construction of a 2 storey extension to the existing Cookhouse Bar & Restaurant to provide extended ground floor bar/restaurant facilities with an external terrace and extended first floor function room facilities over with an external terrace and landscaped roof garden; (e) conversion of the existing Kingswood Country House (a Protected Structure) from bar/restaurant use to a conference centre to include the construction of a new single storey glazed entrance lobby; (f) closing up of the existing external access stair to basement to the rear of Kingswood Country House; (g) associated ancillary site works including hard and soft landscaping and drainage works; (h) provision of new external signage to include the hotel reception and Cookhouse entrance.
The brief summarizes the pattern across all 2,719 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD22A/0141The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief