Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 2,718 decisions within 5 km, 11 exact-site or onsite candidate records, and 1132 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1132 structured nearby appeal records.
1,132 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Retention permission for 3 No of storage units / valeting bays, with car parking car storage area with all associated site works
Alterations to an existing granted planning application (previously granted permissions Reg. Ref. SD18A/0314 [ABP-304148-19], SD19A/0408, SD20A/0187); reconfiguration of the ground floor area consisting of a new ancillary storage area to the proposed building's eastern elevation measuring 75sq.m, at mezzanine level; change of use of 57sq.m of warehouse floor area to staff facilities due to the following, addition of single storey fire protected corridor from Office A to in the south-west corner of the warehouse, overall 45sq.m floor area addition; addition of stairs from warehouse to mezzanine level, overall 12sq.m floor area addition; elevation alterations, introduction of covered glazed structure at the main Office entrance to the front (southern) elevation, overall height 6.18m; introduction of Integrated Modular Louvre System to Charging Area to the front (southern) and side (eastern) elevation; change of colour of southern elevation warehouse canopy to Anthracite; introduction of fire escape doors to the side (eastern) elevation; site plan alterations, omission of an existing roundabout and provision of revised road junction with an access/egress to the proposed development and to the existing Business Park; provision of a new boundary fence Type A to the southern and eastern site boundary; introduction of additional 26 HGV parking spaces to the western concrete yard (overall area 1547sq.m) and the omission of car parking at the same location; introduction of 8 van parking spaces (overall area 240sq.m) and rearrangement of the car parking spaces due to introduction of the above changes, plus addition of gas tank and generator; associated drainage layout adjustments due to the inclusion of the above alterations; all other details such as landscaping, external surface finishes etc. will remain as per the aforementioned granted planning applications.
Alterations to an existing granted planning application (previously granted permission Reg Ref SD18A/0314 [ABP-304148-19]; SD19A/0408), to incorporate elevation revisions only to the front 3 storey attached ancillary office block. the alterations comprise a change of material cladding and fenestration revisions to the front and immediate side elevations of the ancillary offices (south, east and west elevations). The previously approved cladding 'Ceramic Granite' stone finish is proposed to be revised to 'Benchmark Dri-Design Rainscreen Facade' profiled metal cladding system. All other details remain as per the aforementioned granted planning applications.
Alterations to an existing granted planning application Reg. Ref. SD18A/0314 as follows: (1) reconfiguration of the ground floor area with provision of a new ancillary charging area to the proposed building's southern elevation measuring 265sq.m, overall height 6.2m; previously proposed plant room to the building's eastern elevation to be omitted; (2) elevation alterations with introduction of 11 level access doors to the eastern elevation; introduction of charging area to the southern and eastern elevation and rearrangement of fire doors to the eastern elevation; introduction of the canopy above level access doors and horizontal curtain walling above the canopy to the eastern elevation; height reduction to the canopy above level access doors to the western elevation; (3) site plan with rearrangement of the car parking spaces due to the introduction of charging area to the south and level access doors to the east of the proposed warehouse, including the provision of car parking spaces to the west for warehouse staff and omission of HGV parking at the same location; (4) provision of ESB sub-station; incorporating minor adjustments to the drainage on site; all other details will remain as per the granted application Reg. Ref. SD18A/0314.
Warehousing unit incorporating ancillary offices/staff facilities on 3 floors to the front (south) elevation, office/staff facilities for the warehouse use at the rear (north) elevation and plant room, totalling 14,104sq.m gross internal area, which comprises: (1) 12,240sq.m warehousing area (17.9m high); (2) 1,674sq.m front ancillary office/staff facilities area on 3 floors (12.45m high); (3) 122sq.m office/staff facilities attached to the rear of the warehouse (8.4m high), 63sq.m plant room attached to the eastern side of the warehouse (5.7m high). The development also includes: (A) On-site security hut 16sq.m (3.00m high) at the HGV access/egress location; (B) 4,160sq.m solar panels placed on the warehouse roof; (C) Site access; (D) Ancillary car parking (145 spaces); (E) HGV marshalling yard on 16,380sq.m of yard and HGV parking for 49 vehicles; (F) Dock levellers and level access doors; (G) Canopy over level access doors attached to western elevation and canopy over dock levellers at the rear; (H) Perimeter landscaping; (I) Drainage works including underground surface water attenuation facility, flood management measures, foul sewer pumping and storage tank; (J) All services and utilities and (K) All associated site development works.
Alterations to existing granted planning Reg. SD18A/0314, SD19A/0408, SD20A/0187 and SD21A/0239; elevation alterations including change of cladding colour of the security hut from Gull Grey to Anthracite; site plan alterations including omission of the business park existing sliding gate, sliding in to the proposed development carpark area; provision of a new boundary fence Type A to the southern and eastern site boundary; provision of a new security hut disabled car parking space to the west of the hut at HGV access/egress to the development; all other details such as site access, landscaping, external surface finishes, water supply, drainage, attenuation systems etc will remain as per the aforementioned granted planning applications.
The brief summarizes the pattern across all 2,718 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD22A/0283The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief