Permission is sought for development comprising a) the provision of a single storey canopy with metal fascia and column to the carpark elevation of Block 2 at the south office entrance; b) extension of existing paved area (57 sqm) at the south office entrance; c) the proposed canopy will accommodate an area of 2 sqm for signage to the front and side elevation of the canopy and; d) relocation of 3 no. car parking spaces
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lands at 14, Riverwalk Block 2, Citywest Business Campus, Dublin 24
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
16% of nearby decided applications were refused. The preview found 2,349 nearby planning records within 5 km where a location match is available.
- Matched source
- SD22A/0296
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Change of use from education to office use within the existing building. No increase in area, external alterations or extensions are proposed.
Change of use from existing restaurant use at ground floor to proposed office use (235sq.m).
(A) Change of use from laboratories to office accommodation; (B) provision of 803.2sq.m additional office accommodation at first floor with new fenestration on north east and south west facades and the addition of 5 car parking spaces; (C) alterations to internal layouts and additional connections to underground drainage; (D) retention of existing signage on facade and entrance to site.
A high powered electric vehicle charging station consisting of the: (1) Installation of 2 No: Electric vehicle charging bays, and comprising a parking space and electric vehicle charging unit (2) Installation of a prefabricated ESB substation (3) Erection of associated signage (4) All associated lighting, infrastructure and site development works
The development comprises of permission for new signage elements and site development works. As well as retention permission for various minor amendments to the development permitted under South Dublin County Council Planning Reference SD22A/0282. Specifically, 3no additional high power electric vehicle charging units, bollards, and 6no parking spaces, relocation of existing light column and previously approved substation, and all associated site development works.
The full report covers all 2,349 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD22A/0296The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report