Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 3,695 decisions within 5 km, 5 exact-site or onsite candidate records, and 1127 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1127 structured nearby appeal records.
1,127 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Retention for the partial change of use into a childcare facility and all ancillary site works.
The development will consist of the demolition and removal of the existing single storey and temporary buildings on site and, the construction of a Community Centre and Place of Worship ( Mosque ) in a detached part single storey and part two storey building, part pitched and part flat roofed, incorporating solar PV panels and a feature minaret and dome on / over roofs levels, and including the following within the building envelope: Entrance and circulation spaces, reception / refreshment zone, 2 no. retailing / services units, a prayer room and gallery, a multi-purpose events room, 1No. three bedroomed apartment, community health / medical consulting rooms, administrative spaces, a room as a library / book store / meeting room, enclosed car parking and supporting services spaces including for such uses as, toilets and for ablutions, tea stations, storage, service plant, etc. On site but external to the building will be the main vehicular and pedestrian site entrances including gates in the new northern boundary, pedestrian and vehicular circulation routes, boundary treatments including walls and fencing, car and bicycle parking, a small service yard, a community clothes recycling bank, hard and soft landscaped areas including a children's play space etc.
Demolition of two existing unoccupied, unused and dilapidated single storey buildings and the construction of a Community Centre and Place of Worship (Mosque) in a detached three storey over basement building (basement, ground, first and second floors), part pitched and part flat roofed, incorporating solar PV panels and a feature minaret and dome on/over roof levels and including: (a) at basement level - circulation spaces, car parking, bicycle parking, exercise room, service rooms, service plant and bin storage; (b) at ground floor level - main entrance and circulation spaces, administrative spaces, toilets and ablutions areas, storage rooms, tea stations, mortuary, prayer room with supporting service rooms, 2 classrooms, a library/book store, 3 retailing/services units, child minding rooms; (c) at first floor level - circulation spaces, administrative spaces, toilets and ablutions areas, 2 apartments, community health rooms, events room, kitchen/servery, prayer gallery overlooking the prayer room; (d) at second floor level - circulation spaces, administrative spaces, toilets, restaurant, kitchen; external to the building will be main vehicular and pedestrian site entrances including gates in the new northern boundary, limited car and bicycled parking, ramp entrance/exit to & from the underground basement car park, service yard, external circulation, children's play space, hard and soft landscaped areas, boundary treatments including walls and metal fencing; the areas and locations of each use will be shown on the drawings proposed to be lodged with the planning application and the times of use and occupancy of each are listed within written documents to be lodged with the planning application.
Construction of a two-storey flat-roof extension to the side and rear of the existing dwelling, incorporating new side access door and new side and front-facing windows at ground and first floor levels.
Removing two sections of existing concrete apron, extend existing kerb to the end of the concrete apron and erect a proposed new stainless steel and glass bus shelter, 5.2m X 1.85m X 2.8m high on public foot path with 2 No. LED illuminated advertising panels each of 2.0 square meter area
Two storey extension to the side for extended living; Single storey extensions to the front and back at the side.
The brief summarizes the pattern across all 3,695 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD22A/0359The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief