Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 2,363 decisions within 5 km, 1 exact-site or onsite candidate record, and 465 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
465 structured nearby appeal records.
465 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Opening up of the existing facade to facilitate the installation of 2 new windows into the first floor office area of the existing water treatment building.
Demolition of existing workshop and (defunct) Activated Carbon Building adjacent the old/northern Treatment Plant Building; construction of a Sulphuric Acid Storage and Dosing Facility Building (single storey up to approximately 8.7 metres in height) adjacent the new/southern Treatment Plant Building; construction of a Lime Storage & Dosing Facility Building (single storey up to approximately 11 metres in height) adjoining the old/northern Treatment Plant Building, associated external storage silos (2) with external staircase (up to approximately 12.3 metres in height) partially enveloped with a perforated metal architectural screen, and ancillary plant and equipment; reconfiguration and repurposing for use as a De-Alkalisation Plant of existing (disused) High-Lift Pump Hall within the old/northern Treatment Plant Building; construction of a new ancillary Workshop Building (single storey up to approximately 4.5 metres in height) to the rear/south of the 'old/northern Treatment Plant Building; temporary and enabling works to facilitate construction and continued / uninterrupted operation of the Treatment Plant site; associated network of underground pipelines/connections, and redirection of existing where necessary, throughout the site; provision of additional car parking (to the rear/south of the old/northern Treatment Plant Building), modification and extension of existing drainage, utility and services infrastructure and connections to serve and facilitate new and reconfigured buildings, and all other associated and ancillary development and works above and below ground level.
Retention of garage for the sale/hire of cars, 2 portacabins, signage and ancillary site works in conjunction with the operation of Weston Airport.
Erection of a 17.5m SCADA communications pole with associated underground cable ducting enclosed in a 2.4m high fenced compound.
The construction of a 2000mm high boundary consisting of a 500mm low planter, made of a dry wall to the house side and a low gabion wall to River Liffey side with a 1500mm high metal security fence atop the planter along the entire boundary between the rear of the existing bungalow and the River Liffey to a seating area; seating area shall have a glass balustrade railing with a paved surface and seating; associated landscape works of paving, dry wall, tree, shrub and hedge planting for screening to M4 motorway and River Liffey.
Two storey extension to side and rear of existing house (a Protected Structure).
The brief summarizes the pattern across all 2,363 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD22A/0423The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief