Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 4,071 decisions within 5 km, 8 exact-site or onsite candidate records, and 1658 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1658 structured nearby appeal records.
1,658 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Dormer window to the front area; new side gable window
The conversion of existing attic into a storage space which incorporates a new dormer window to the roof on the front Elevation
Conversion of Attic to habitable space to include dormer roof to the rear
Provision of a temporary two storey post-primary school (Firhouse Educate Together Secondary School: Roll No. 68307J), comprising 10 classrooms and 3 specialist classrooms including all ancillary teacher and pupil facilities (2,000sq.m. gross floor area approximately); provision of an internal vehicular drop-off area and internal circulation routes; 15 surface parking spaces; bicycle parking; ball courts and play areas; access to the proposed temporary school will be from Oldcourt Road; provision of piped infrastructure and ducting; plant; pedestrian access points; ESB substation; attenuation tank; landscaping and boundary treatments; ancillary ramps and stairs; signage; changes in level and all associated site development and excavation works above and below ground; on a 0.86ha site approximately, which forms part of a larger 1.77ha landholding earmarked to accommodate a future permanent post-primary school; temporary permission for a period of 5 years is being sought.
The Conversion of existing attic in to a bedroom & ensuite bathroom which incorporates a new dormer window to the roof on the front elevation
New educational campus, to be delivered on a phased basis comprising 1 No. part 3 storey, 1,000 pupil Post Primary School (Firhouse Educate Together Secondary School: Roll No. 68307J) and includes accommodation for children with special educational needs, a multi-purpose hall and all ancillary teacher and pupil facilities with a gross floor area of c. 11,021 sq.m; The development will also include and permanently incorporate elements of the temporary two storey postprimary school development (permitted under An Bord Pleanála Ref: ABP-311141-21; South Dublin County Council Reg. Ref. SD21A/0137), including vehicular access from Oldcourt Road; 3 ball courts; 2 pedestrian and cyclist access points and 1 pedestrian only access point to the northern boundary of the site; car parking; surface water drainage; attenuation tanks; piped infrastructure and ducting; changes in level and all associated site development and excavation works above and below ground; The development will also include minor revisions to the previously permitted car parking area to allow for the provision of additional car parking spaces to serve the Post Primary School; The development will also include 3 additional ball courts and play areas; 1 storage building (c. 48 sq.m); car parking; electric vehicle charging points; bicycle parking; hard and soft landscaping; waste management provision; cycle and pedestrian routes; boundary treatments; ancillary ramps and stairs; signage; attenuation tank; PV panels; boiler and plant; surface water drainage and SuDS measures (including green roofs); 3 flag poles; street and security lighting; piped infrastructural services and connections; changes in level and all associated site development and excavation works above and below ground; The development will also consist of the retention of an ESB substation located to the south of the vehicular entrance at Oldcourt Road.
The brief summarizes the pattern across all 4,071 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD22B/0111The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief