Applications tied to the site
Partial coverage32 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
32 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 8,932 decisions within 5 km, 32 exact-site or onsite candidate records, and 2584 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
32 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
32 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2584 structured nearby appeal records.
2,584 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Retention of alterations to dwelling including single storey pitched roof extension to the rear; dormer attic extension to the front and rear roof; single storey extension to the front and internal changes to the layout and associated site works.
A ground-floor rear extension, levelling the side extension and the porch floors with the main house, and provision of a new roof, a part attic conversion to habitable status with new dormer roofs to the front and rear, reconfiguration of the ground & first-floor layouts, and all ancillary works necessary to facilitate the development.
The development will consist of ground floor extension to the rear, demolition of the side extensions and porch, and the construction of a two storey extension the side, a new porch extension to the front, rooflights to the front, a part attic extension to habitable status provision of dormer roofs to the front and rear, internal reconfiguration of the ground and first floor layouts and all ancillary works to facilitate the development
The development will consist of an attic conversion to habitable status comprising of two bedrooms and a bathroom with dormer roofs to the front and rear.
Upgrading works to include partial demolition of single storey side garage; internal alterations to include conversion of attic to include 2 bedrooms subject to Building Regulations compliance; construction of single storey extension to side and rear; dormer structures at attic level to front and rear; 2 flush glazed roof lights; landscaping works to include privacy planting; SUDS drainage; all associated ancillary works to facilitate the development.
Retention modifications to the existing 1.5 storey dormer house: External insulation and render to North and East elevation. Ground floor rear extension 23.9sqm. First floor rear dormer extension 12.1sqm.
The brief summarizes the pattern across all 8,932 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD22B/0159The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief