Applications tied to the site
Partial coverage33 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
33 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 5,242 decisions within 5 km, 33 exact-site or onsite candidate records, and 1228 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
33 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
33 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1228 structured nearby appeal records.
1,228 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
A) Retention permission for existing metal cladding roof finish on the two story section of the rear extension. (This roof finish has been installed to match existing finish on lower roof.) b) Planning permission for a proposed dormer window to side roof on main house and associated attic conversion, and velux windows to the rear roof
Retain existing two storey flat roof extension including parapet at rear of house including existing first floor rear window (with obscure glass).
The development will consist of single storey front, side and rear extension and subdivision of existing 2 storey 4 bed dwelling, to reinstate the original 3 bed dwelling and form a new 2 bed terraced dwelling. Works include subdivision of the site with front boundary alterations to create a new vehicular access gateway plus all associated site works.
Single storey front extension with a pitched roof; revised pitched roof over front entrance; attic conversion to storage space with a rear dormer sloping roof containing two windows; roof light on the main front elevation roof; wide sliding door to the rear extension to replace window and door; general internal alterations to house on ground and first floor levels.
Demolish existing single storey, front side and rear extension, and detached shed to rear. Construct two storey side with forward projecting front and rear two storey extension extended elements, single storey front extension, single storey rear extension, varied internal modifications
Demolish existing single storey side and rear extension, construct single storey front, side and rear extension, attic conversion to storage space with dormer windows on both the side and rear elevations. Minor relocation of first floor rear bedroom windows, form rear corner window on first floor bathroom, widen existing vehicular access to 3500mm.
The brief summarizes the pattern across all 5,242 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD22B/0416The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief