Extension at first floor level to side above existing garage / utility comprising of 19.5sq.m including extending existing tiled roof; Extend 7sq.m to existing ground floor kitchen extension to rear (Reg. K-829 July 1976); Provide access to attic for additional wc / shower, inline roof lights and playroom; Porch to front 2.5sq.m with lean to tiled roof extending to cover garage door; Widen vehicle entrance to 3.5m to allow for access for 2 off-road parking spaces.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
38, Fernhill Road, Dublin 12
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 8,922 nearby planning records within 5 km where a location match is available.
- Matched source
- SD22B/0452
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The proposed development will consist of the demolition of the existing side extension, internal alterations to existing ground and first floor levels, the construction of a part single-storey and part two-storey extension to the rear and side of the existing dwelling, alterations to the existing materiality and fenestration details to the existing dwelling, the construction of a new garden studio to accommodate a home office, gym and bathroom, along with alterations to the existing vehicular entrance, all along with associated landscaping, ancillary and site works.
Demolition of single storey converted garage; single storey extension to front; 2 storey extension to side; single storey extension to rear; all associated windows and site works.
Two storey extension and alterations to existing school including all associated site works.
Retention planning permission and planning permission for development at Holy Spirit Junior Primary School, Greenhills, Walkinstown, Dublin12. The development will consist of: (1) Retention of existing single storey prefabricated classroom building including all associated site works. (Planning Reference: SD17A/0184 (2) Planning permission to retain the temporary prefabricated classroom building including all associated site works as granted under planning reference SD17A/0184 for a further period of 5 years.
Extensions to front/side of existing dwelling consisting of single storey extension to living room; covered external porch area; extension to ground floor previously converted study office; first floor extension over existing study/kitchen to provide bedroom/ensuite with hipped roof with gable A roof to front; alterations to existing boundary wall to increase height to circa 1.9m-2.35m and all associated site works.
The full report covers all 8,922 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD22B/0452The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report