Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
16, The Close, Boden Park, Dublin 16Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

16, The Close, Boden Park, Dublin 16

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

10% of nearby decided applications were refused. The site check found 7,420 decisions within 5 km, 31 exact-site or onsite candidate records, and 2480 structured appeals.

Matched source
SD22B/0487
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

31 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

31 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.

3 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

2480 structured nearby appeal records.

2,480 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.

1 matched
7,420Nearby applications
31Site-linked candidates
10%Nearby refused
2,480Structured appeals

Top refusal reasons nearby

Residential Amenity5
Traffic Sightlines5
Visual Amenity3
Other2
Procedure Invalid2

Nearest planning decisions

SD22B/0487

Front side garden fence for height above 1.2m.

Granted0.0 km11 January 2023
SD23B/0172

Conversion of attic storage area to include modification of roof structure to a Dutch hip, addition of a rear dormer and removal of chimney to attic floor level.

Granted0.0 km08 June 2023
SD21A/0292

Modification to existing grant of permission, Ref. SD12A/0094, by increasing enrolment in the morning preschool session (9am until 12 noon) Monday to Friday, from 14 to 16 children; modification to existing grant of permission, Ref. SD19A/0066, consisting of increasing enrolment in the afternoon preschool session (1pm to 4pm) Monday to Friday, from 11 to 16 children.

Granted0.1 km17 December 2021
SD19A/0066

Operating a second preschool session from 1pm to 4pm, Monday to Friday, enrolling up to 11 children.

Granted0.1 km18 April 2019
SD20B/0368

Single storey extension to front and two storey extension to side

Granted0.1 km12 January 2021
SD22B/0156

Extend first floor bedroom to rear with rear facing dormer window; convert roof space to a storage area with rear facing dormer window; provide a high gable window to stairwell; construct a front porch.

Granted0.1 km08 August 2022

The brief summarizes the pattern across all 7,420 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required