Construction of 2 office rooms at attic level with dormer structure to the rear, 2 rooflights to the front, 1 rooflight on the side and relocation of solar panels to south elevation and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
39, Wilkins Court, Limekilnfarm, Dublin 12, D12 FX9F
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 8,217 nearby planning records within 5 km where a location match is available.
- Matched source
- SD22B/0538
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Construction of new bedroom, walk-in wardrobe and wc semi-detached property at attic level and associated works to include a new window and 'Velux' window on the front elevation; 'Velux window to the rear and window on the gable side.
Conversion of existing attic space comprising of modification of existing roof structure; new gable window; new window to front gable; new access stairs; new roof window to the front and rear; flat roof dormer to rear.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, A-style roof dormer and 2 no. roof windows to the front and flat roof dormer to the rear.
Conversion of attic space with new rooflights in roof to front and back of house.
Conversion of existing attic space comprising of modification of roof structure, new front window, roof windows to front and rear and new access stairs.
The full report covers all 8,217 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD22B/0538The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report