Applications tied to the site
Partial coverage18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
18 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 2,528 decisions within 5 km, 18 exact-site or onsite candidate records, and 562 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
18 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
562 structured nearby appeal records.
562 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Proposed single storey domestic extension to rear, change of existing roof profile to mini-hip, dormer to the rear, Velux to front, window to side and all associated site works
The change of use on ground floor only from Montessori school to residential units, comprising of 2 No. 2-bed ground floor apartments, each apartment has 2 bedrooms, wheelchair accessible bathroom, kitchen area, living area and storage room. Erect a ground floor single storey rear extension, 6 no. car park spaces, bin store and all associated site works.
Single storey side extension to include relocation of front entrance; existing garage section behind converted to habitable space with a new pitched roof over; new pitched roof over existing rear extension incorporating feature floating window on rear extension facing rear coutyard.
Construction of 1. First floor dormer roof extension to the side (west) elevation incorporating first floor modifications including an additional bedroom, bathroom and walk in wardrobe, 2. a rear (south) single storey extension to accommodate a kitchen/dining/living space, 3. the conversion of the existing garage space to accommodate a bathroom, utility and office and 4. widening of the existing vehicular entrance, plus all associated site works.
First Floor extension over existing single storey structure to side and a two storey extension to front of existing dwelling.
Demolition of an existing single storey garage to side (east); erection of a single storey extension to side (east) and rear (south) elevations of existing dwelling to include for playroom/gym, master bedroom, en-suite toilet, walk in wardrobe, and utility on ground floor level; 2 rooflights to utility and en-suite; re-positioning of main entrance/doorway from the side (east) to the front (north) elevation inclusive of all associated site works.
The brief summarizes the pattern across all 2,528 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD23B/0402The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief