Applications tied to the site
Partial coverage18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
18 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 7,117 decisions within 5 km, 18 exact-site or onsite candidate records, and 2409 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
18 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
18 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2409 structured nearby appeal records.
2,409 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
New front, side and rear extension to the existing two storey dwelling with a flat roof with rooflights: new dormer structure to the existing rear tiled roof: conversion of the existing attic area into a new non-habitable area: internal alterations: external finishes to match existing and associate site works.
Construction of a new two storey extension to the side; a single storey extension to the rear; attic conversion to the front elevational changes to the existing dwelling. Development to include a new bay window associated to the front elevation; a single storey extension to rear measuring 10sq.m; side extension at first floor level measuring 22sq.m; with the new window opens to the north and south elevations; associated roof amendments and 1no. front facing Velux; new attic conversion with zinc dormer to the rear; minor elevation changes; amendments to the internal layout and all associated site works. New materials to compliment the existing dwelling.
Demolition of an existing flat roofed car port and covered storage area to the side of existing house to be replaced with new single storey pitched roof side extension including 'Velux' windows to front and back with minor internal alterations; associated site works and services.
Conversion of the attic space to a bedroom, ensuite and storage, new velux window to the front and two dormer roof construction to the rear, internal modifications and all associated site works.
Dormer to rear of existing converted attic space, single storey extensions to rear and side of existing dwelling and all associated site works
Proposed partial ground floor front/ side extension with pitched roof over attic conversion with dormer roof window & 2 no. roof lights on rear slope of roof at attic level. First floor side/rear partial extension with flat roof over
The brief summarizes the pattern across all 7,117 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD23B/0466The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief