Applications tied to the site
Partial coverage35 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
35 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 3,484 decisions within 5 km, 35 exact-site or onsite candidate records, and 845 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
35 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
35 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
845 structured nearby appeal records.
845 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Planning Permission for the following works; -to merge house 95 & 96 into one single dwelling house. -demolish existing porch to front of house no. 95 -demolish existing rear extension of house no. 96. -to replace existing front door ope of house no. 95 with glazed panel. -to construct a 2 storey extension to rear of combined dwelling house and all associated site works.
Permission for an extension to a semi-detached dwelling. Development will consist of construction of attic conversion with a dormer window to rear, and associated site works
Porch Extension and Conversion of attic space comprising of modification to existing roof structure, raising existing gable including window and Dutch hip, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modifications to existing roof structure, raising of existing gable c/w window and 'Dutch' hip, new access stairs and flat roof dormer to the rear.
To demolish the following (a) existing porch and canopy to the front of the dwelling (b) to remove an existing timber covered roof to side walkway along gable wall (c) small walled structure construction to rear of the timber covered roof at rear of dwelling. (2) To construct a single storey extension to front of dwelling. (3) To construct a single storey extension to rear of existing dwelling. (4) To construct an attic conversion including a dormer type roof at rear of dwelling. this will include removing the existing hip roof to the front and rear of the existing dwelling and extending the (a) roof structure out to gable wall to front and rear of the existing dwelling. (5) All ancillary site works 0.035
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
The brief summarizes the pattern across all 3,484 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD24A/0041The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief