Applications tied to the site
Partial coverage34 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
34 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 4,210 decisions within 5 km, 34 exact-site or onsite candidate records, and 1442 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
34 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
34 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1442 structured nearby appeal records.
1,442 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
For replacement of existing playing pitch with construction of an all-weather pitch with 1800mm high perimeter fence and walking path with 3 No. 12m high floodlighting columns with 3No.floodlights on each, associated additional 6 No. carparking spaces and ancillary site works.
Demolish part of the modern extension constructed at the southern end of the original school building in order to construct a new single storey extension to accommodate a unit for children with special needs; ancillary works will include modifications to the original classroom block and the provision of new car parking spaces in the western forecourt area.
Change of use from residential dwelling, to use as an early childhood education Creche / Childcare facility for 58 No. of childcare places, operating between the hours of 7.30am - 6pm, Monday to Friday working in conjunction with existing facility to rear of the property.
The development will consist of the sub-division of the existing dwelling and site to create 2 No. of 3 Bedroom semi-detached dwellings, with internal modifications, new gable-end type pitched roof, new ground floor extension to front, new vehicular access and associated site works.
Retention of existing first floor extension over garage. Permission for new alterations/extensions to the existing two storey semi-detached house comprising: demolition of the existing single storey rear sunroom and living room extension and construction of a new single storey flat roof extension to the rear with 3 new rooflights; reinstating the garage to it's original use and construction of new flat roof canopy to the front porch with associated modifications to the existing fenestration and site development.
Demolition of existing garage and construction of a single storey extension to side of dwelling with associated windows and site works.
The brief summarizes the pattern across all 4,210 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD24A/0085WThe site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief