Proposed 2 storey 3 bedroom house with new waste water treatment system and new entrance drive off old Newcastle Road.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Site at Tay Lane, Commons Little, Newcastle, Co. Dublin.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
20% of nearby decided applications were refused. The preview found 967 nearby planning records within 5 km where a location match is available.
- Matched source
- SD24A/0176
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
(a) A standalone single storey office building and staffing facilities comprising of an area of 156sq.m; (b) The addition of staff car parking facilities comprising of 14 car parking spaces; (c) The addition of a new onsite bio cycle treatment plant treatment facility to service new office and staffing accommodation; (d) New ESB substation; (e) Landscaping boundary screening and new security fencing along with all ancillary site works.
The development will consist of a 4.42 hectare stie currently in use as Greenogue Recycling to include the following; A) Demolition of existing green recycling structures on site including office and storage shed with total area of 2,265m2. B) Construction of 7 no. warehouse units, with maximum height of 15.3 meters, all with ancillary office, staff areas, bin stores etc. Each unit has access to service yard and HGV loading / unloading area. The total floor area of the warehouse development is 16,602.2 m2, made up as follows; i) Unit 1 - gross floor area of 3,851.1 m2. ii) Unit 2 - gross floor area of 3,886.8 m2. iii) Unit 3 - gross floor area of 2,758.3 m2. iv) Unit 4 - gross floor area of 1,685.4 m2. v) Unit 5 - gross floor area of 1,062.2 m2. vi) Unit 6 - gross floor area of 1,679.2 m2. vii) Unit 7 - gross floor area of 1,679.2 m2. C) Access to be provided from existing entrance to the site via Tay Lane. New footpaths / cyclepaths throughout the site including a new footpath / cyclepath connection to the Greenogue Logistics Park to the north of the site. D) 170 no. car parking spaces and 100 no. secure, sheltered bicycle parking spaces to serve the warehouse units. E) All ancillary site development works to include; minor realignment of site entrance, landscaping, internal raods, drainage, utility services, service yards, HGV loading / unloading areas, level access goods doors, dock levellers, site lighting, boundary treatments, signage, storm water drainage network, underground water and foul servicing, green roofs on warehouse units, form part of this application.
Replacing existing single storey 2 bed house with new 3 bed dormer bungalow. Development also consists of demolition of existing bungalow/garage and replacing existing septic tank with Kingspan sump pump to public sewer.
Modifications to the previously permitted Ref. SD16A/0406 consisting of the change of use of the dry bailing facility to a green waste recycling facility (excluding food and household general waste collection) including renovation and upgrade works to the fire damaged buildings and the addition of new green waste storage area and attenuation tanks (this application will also require a Waste Licence).
The development will comprise the provision of a warehouse with ancillary office and staff facilities. The warehouse will have a maximum height of 19.2 metres with a gross floor area of 34,737 sq m, including warehouse area (32,404 sq m) and ancillary office and staff facilities area (2,333 sq m). The development, which will have a total Gross Floor Area of 34,999 sq m, will also include: 1 No. multi-modal entrance to the site from Greenogue Logistics Park; 156 No. car parking spaces; HGV parking spaces and yard; 90 No. covered bike parking spaces; dock levellers; green walls, sprinkler tank and pumphouse (219 sq m); ESB substation (43 sq m); gates; hard and soft landscaping and boundary treatments; and all associated site development works above and below ground.
Source match
Matched from public planning record SD24A/0176The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report