The development will consist of a fuel tank set down area and canopy (approx. c.279sqm and c.4.8m in height) at Microsoft Grange Castle Campus. All other site development and ancillary works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Grangecastle Business Park, New Nangor Road (R134), Clondalkin, Dublin 22
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 2,463 nearby planning records within 5 km where a location match is available.
- Matched source
- SD24A/0242W
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Retention of internal modifications to existing house (as permitted under SD08B/0738 and SD09B/0235) to now provide a family dwelling with guest accommodation (12 bedrooms); all associated site development works, services provision, parking, landscaping/boundary treatment works.
Retention of 1 standby diesel generator with an associated flue (15m high) within the permitted generator compound located to the east of the data centre granted under SDCC Reg. SD16A/0345 increasing the number of standby diesel generators from 5 to 6 within the permitted compound.
Enabling works to facilitate the future development of the site; topsoil strip and a cut and fill operation across the site; temporary construction access will be created off the R120 to facilitate the works within the townland of Ballymakaily to the west of the Newcastle Road (R120).
Permission for development at this site within the townland of Ballymakaily to the west of the Newcastle Road, Lucan, Co. Dublin. The development will consist of amendments to the permitted development as granted under SDCC Planning Ref. SD19A/0042 that will include: - Reduction in the number of back-up generators, flues and other related plant from 32 to 24 within the permitted generator compound located to the west of the data centre granted under SDCC Planning Ref. SD19A/0042; and - Repositioning of the 24 no. back-up generators, flues and other plant within the permitted generator compound.
Construction of P3 Phase II expansion of the existing P3 biopharma production facility which includes the construction of a circa 2,155sq.m, two storey biopharma production facility to a maximum height of circa 14.9m to be located to the south of the existing P3 building; single storey administration extension of circa 210sq.m to a maximum height of 4m to the north of the existing P3 building and internal modifications to the existing P3 building in addition to all associated site works including delivery area; courier pick up/drop off area with 5 parking spaces (including 1 accessible parking space and 1 E-car space); extension to existing external utilities yard (circa 485sq.m) for 3 heat pumps and other ancillary equipment; new internal site circulation road and re-alignment of existing circulation road; 48 additional car parking spaces (including 3 accessible parking spaces and 5 E-car spaces); 24 covered bicycle stands, hard and soft landscaping and external lighting; there will be temporary site entrance and associated temporary access road located to the south east of the site during the construction phase all on 3.68 Hectare application site located within the Takeda Ireland facility at Grange Castle Business Park; an EIAR (Environmental Impact Assessment Report) is submitted with the application and relates to development comprising of an activity which requires and Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
The full report covers all 2,463 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record SD24A/0242WThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report